论文部分内容阅读
庐山大厦的基础施工,依据逆作法的施工原理,与结构形式、地下室的层数、土的抗剪能力相结合,采取中心岛结构“顺作”,周边板面结构“逆作”的方法,解决场地狭窄的高层建筑深基坑支护问题。
The foundation construction of Laoshan Tower is based on the construction principle of the reverse method, combined with the structural form, the number of layers in the basement, and the shear resistance of the soil, and adopts the method of “successful operation” of the center island structure and the “reverse construction” of the surrounding plate structure. Resolve the problem of deep foundation pit support for high-rise buildings with narrow space.