论文部分内容阅读
根据系统、规范的质量保证分级方法对核电常规岛安装施工活动进行分级,可以合理地分配有限的资源,确保核电常规岛安装中关键施工活动的质量。本文分析了核电常规岛质保分级的目的、方法以及分级中可能存在的问题,给出既能实现合理分配资源又具有一定可操作性的施工活动的分级方法,以便对不同等级的安装施工活动采取不同的分级管理。
According to the systematic and standardized method of quality assurance grading, the routine construction and installation activities of nuclear power plants are graded, which can rationally allocate limited resources and ensure the quality of key construction activities during the installation of nuclear conventional islands. This paper analyzes the purpose, method and possible problems in grading of conventional nuclear quality assurance of nuclear power plant, and gives a grading method of construction activities which can not only realize the rational allocation of resources but also have certain maneuverability, in order to take different measures of installation and construction activities Different levels of management.