摘要:氧化铝产品凭借其优越的设备性能,在冶金业、建筑业中的运用十分广泛,基本满足了企业项目新建、改造和扩建的应用要求。氧化铝吊装是整个工程的关键内容,只有保证吊装方案与施工要求相一致,才能符合业主对项目质量的要求。从实际吊装操作情况看,因吊装人员专业技能不足、管理不到位,导致氧化铝吊装设备性能不能完全发挥,影响了施工现场作业的顺利实施。本文以溶出及蒸发系统设备吊装为例,分析了氧化铝设备吊装的相关问题。
关键词:氧化铝;吊装技術;不足;改进
Abstract: the alumina products with its excellent equipment performance, in metallurgy industry, the use of the construction is very extensive, satisfy basically enterprise project construction, modification and extension of the application requirements. Alumina is the key to the whole project hoisting content, only ensure lifting scheme and construction in line, to meet the requirements of the quality of the owner to the project. From the actual lifting operation, we can see the professional skill shortage for hoisting, management does not reach the designated position, cause of hoisting equipment performance can't completely alumina play, the impact of the smooth implementation of the construction field work. This paper to dissolve out and evaporation equipment hoisting system as an example, analyzed the lifting of the related problems of alumina equipment.
Keywords: alumina; Lifting technique; Insufficient; improvement
中图分类号: U294.27+5文献标识码:A文章编号:
氧化铝项目是现代冶金制造业的重点工程,关系着社会主义现代化改造发展的趋势。吊装作业是项目施工的核心内容,吊装作业的质量决定了整个项目的竣工成效。由于现场负责人缺乏先进的管理意识,对吊装施工未采取针对性的管理方案,导致吊装技术运用出现诸多缺陷。为了保证工程项目的顺利实施,对氧化铝吊装技术加强改进是极为重要的。
一、工程概况
氧化铝溶出系统和蒸发系统是氧化铝工程的核心部位,涉及到的主要设备有停留罐、I~Ⅲ效管式降膜蒸发器、Ⅳ~Ⅵ效板式降膜蒸发器等。其设备重量均达100T以上,在安装吊装过程中尤为重要,结合现场实际情况,周全考虑吊装工艺及施工技术是设备安装就位的关键。
二、氧化铝吊装技术的不足
调查显示,中小型企业氧化铝扩建涉及重量在100吨左右,大型工程的氧化铝量超过200吨以上,对当地铝业产业链的优化升级起到了重要的推动作用。吊装施工是扩建工程的关键内容,因吊装操作流程的复杂性,导致氧化铝吊装技术运用呈现多方面的不足。
1、管理问题。编制科学的管理制度是指导现场吊装的主要依据,管理失效必然造成氧化铝吊装技术运用不当,阻碍了施工现场作业的效率。通常,氧化铝吊装的主要对象包括:大型设备、钢柱、屋架、构件等,各个小项目需不断完善管理,才可保证总扩建工程的作业水平[1]。管理人员仅注重某一个吊装项目的管理,与其它吊装操作未能协调进行。
2、质量问题。导致吊装质量不合格的因素相对复杂,多数表现在:一是技能问题,参与吊装作业人员的专业技能不强,对氧化铝工程改造的技术要求掌握不足,实际吊装容易出现各种失误现象;二是工艺问题,施工单位提供的吊装工艺图与现场情况不一致,造成作业人员频繁更改吊装方式,这些问题都会对氧化铝吊装作业质量造成不利。
3、工序问题。铝业工程吊装对操作工序的要求十分严格,不同的操作工序会带来不一样的吊装成效。施工单位在工程动工前期提供了明确的吊装工艺方案,但受到吊装施工条件的限制,现场不得不更改吊装操作工序。如:工艺方案的更改,影响了吊装方案的执行;操作秩序的调整,给吊装人员的设备安装造成较大的困难等。
三、解决氧化铝吊装作业缺陷的意义
新时期国家对铝业发展提出了新的指导,要求改行业在完成项目施工期间必须坚持“安全第一、效益优先”的准则。既要控制现场吊装施工的质量,也要防止作业中发生意外事故,积极营造优越的生产作业环境。解决氧化铝吊装作业缺陷的主要意义:
1、耐久性。随着铝业工程建造活动的广泛开展,尤其是氧化铝吊装作业的质量一直是企业关注的焦点。解决吊装作业过程存在的缺陷,有助于增强氧化铝设备的使用寿命,避免现场吊装作业发生意外事故。此外,经过氧化铝结构的优化调整,可增强其牢固性和稳定性,使得氧化铝设备的使用寿命更长,加快了铝业制造活动的稳步运行。
2、安全性。氧化铝吊装已经成为我国铝业发展的重点工程,关系着铝业制造生产效率的提升,推动了社会主义现代化新建、改建和扩建工程的实施。但是,氧化铝吊装存在的病害现象也影响了现场操作的安全性,设备及构件失稳、坍陷等问题不利于现场吊装施工的有序进行,施工单位在吊装前制定处理方案可提升作业的安全性,全面提升了吊装作业的质量。
3、抗害性。金属构件是氧化铝吊装的基本组成,氧化铝结构发生病害对整个吊装作业的质量是极为不利的。施工单位提前采取预防性处理防范,对氧化铝吊装进行加固或改良处理,可有效降低工程病害的发生率[2]。如:吊装作业中定期对可能出现病害的结构做更换、修补处理,可增强工程结构的抗害性能,有助于降低吊装作业病害的发生率。
四、氧化铝吊装的程序及工艺
做好吊装前向所有施工人员进行详细技术交底,务必使作业人员明白作业要求,给吊车司机详细介绍吊装方案,严格按照施工图纸进行施工,严格遵守国家和设计院规定的有关质量标准和操作规程的规定。施工中要坚持自检,互检和专业检查相结合的互检制度,发现问题,及时进行解决。
1、准备。吊车按计划选用配置的要求和主吊臂臂长,主配重总量,将主吊车安装好,吊索按吊装要求挂设好[3]。正式起吊前,检查吊车站位,接杆是否符合要求,支腿的垫铁是否牢固,起重索具穿绕挂设和工具安装是否符合规范要求等,全部检查无误,报吊装总指挥批准后进行试吊。
2、试吊。拆除临时固定索具,指挥吊车缓将设备吊离支撑约200mm,停车检查吊车的受力情况,吊车支腿处地基沉降情况,工索具受力情况,起重指挥信号联系是否畅通无误,如无异常情况,将设备缓慢落回原位准备正式吊装。
3、起吊。指挥吊车缓慢起吊,设备离支撑物约200mm,停车按试车要求检查各部位,如无异常,开始正式起吊[4]。在吊装过程中,随时检查吊车配合作业过程中吊车滑轮组是否垂直受力,吊车支腿的垫设及地基沉降情况等。
4、检查。吊车缓慢将钢结构就位,就位时应密切关注吊车吊臂是否与钢结构碰杆,检查确认操作半径。确认钢结构安装符合要求后,摘除吊索,吊车转场,吊装结束。操作结束后要检查设备与构件的配合程度,确保设备性能的正常发挥。
结论
总之,国内大部分重工业地区正积极实施氧化铝扩建工程,以辅助工业化生产活动的全面开展。氧化铝吊装是一项极为复杂的操作项目,作业期间出现任何问题均会给项目建设带来不利影响。针对氧化铝吊装技术运用存在的不足,企业必须采取综合性的解决方案,从安全、技术、监管等方面营造优越的施工环境。
【参考文献】
[1]候在平.100吨氧化铝扩建工程项目吊装管理的策略[J].冶金制造,2011,32(6):43-45.
[2]姜欣雨.氧化铝厂高压溶出料浆管道焊接制作工艺[J].中小企业管理,2010,18(3):5-8.
[3]朱绍才.浅谈氧化铝构件组合焊接的工艺流程[J].现代机械,2010,23(18):50-52.
[4]黄卫平.氧化铝吊装技术运用的不足及优化[J].山西铝业,2010,17(10):66-68.
关键词:氧化铝;吊装技術;不足;改进
Abstract: the alumina products with its excellent equipment performance, in metallurgy industry, the use of the construction is very extensive, satisfy basically enterprise project construction, modification and extension of the application requirements. Alumina is the key to the whole project hoisting content, only ensure lifting scheme and construction in line, to meet the requirements of the quality of the owner to the project. From the actual lifting operation, we can see the professional skill shortage for hoisting, management does not reach the designated position, cause of hoisting equipment performance can't completely alumina play, the impact of the smooth implementation of the construction field work. This paper to dissolve out and evaporation equipment hoisting system as an example, analyzed the lifting of the related problems of alumina equipment.
Keywords: alumina; Lifting technique; Insufficient; improvement
中图分类号: U294.27+5文献标识码:A文章编号:
氧化铝项目是现代冶金制造业的重点工程,关系着社会主义现代化改造发展的趋势。吊装作业是项目施工的核心内容,吊装作业的质量决定了整个项目的竣工成效。由于现场负责人缺乏先进的管理意识,对吊装施工未采取针对性的管理方案,导致吊装技术运用出现诸多缺陷。为了保证工程项目的顺利实施,对氧化铝吊装技术加强改进是极为重要的。
一、工程概况
氧化铝溶出系统和蒸发系统是氧化铝工程的核心部位,涉及到的主要设备有停留罐、I~Ⅲ效管式降膜蒸发器、Ⅳ~Ⅵ效板式降膜蒸发器等。其设备重量均达100T以上,在安装吊装过程中尤为重要,结合现场实际情况,周全考虑吊装工艺及施工技术是设备安装就位的关键。
二、氧化铝吊装技术的不足
调查显示,中小型企业氧化铝扩建涉及重量在100吨左右,大型工程的氧化铝量超过200吨以上,对当地铝业产业链的优化升级起到了重要的推动作用。吊装施工是扩建工程的关键内容,因吊装操作流程的复杂性,导致氧化铝吊装技术运用呈现多方面的不足。
1、管理问题。编制科学的管理制度是指导现场吊装的主要依据,管理失效必然造成氧化铝吊装技术运用不当,阻碍了施工现场作业的效率。通常,氧化铝吊装的主要对象包括:大型设备、钢柱、屋架、构件等,各个小项目需不断完善管理,才可保证总扩建工程的作业水平[1]。管理人员仅注重某一个吊装项目的管理,与其它吊装操作未能协调进行。
2、质量问题。导致吊装质量不合格的因素相对复杂,多数表现在:一是技能问题,参与吊装作业人员的专业技能不强,对氧化铝工程改造的技术要求掌握不足,实际吊装容易出现各种失误现象;二是工艺问题,施工单位提供的吊装工艺图与现场情况不一致,造成作业人员频繁更改吊装方式,这些问题都会对氧化铝吊装作业质量造成不利。
3、工序问题。铝业工程吊装对操作工序的要求十分严格,不同的操作工序会带来不一样的吊装成效。施工单位在工程动工前期提供了明确的吊装工艺方案,但受到吊装施工条件的限制,现场不得不更改吊装操作工序。如:工艺方案的更改,影响了吊装方案的执行;操作秩序的调整,给吊装人员的设备安装造成较大的困难等。
三、解决氧化铝吊装作业缺陷的意义
新时期国家对铝业发展提出了新的指导,要求改行业在完成项目施工期间必须坚持“安全第一、效益优先”的准则。既要控制现场吊装施工的质量,也要防止作业中发生意外事故,积极营造优越的生产作业环境。解决氧化铝吊装作业缺陷的主要意义:
1、耐久性。随着铝业工程建造活动的广泛开展,尤其是氧化铝吊装作业的质量一直是企业关注的焦点。解决吊装作业过程存在的缺陷,有助于增强氧化铝设备的使用寿命,避免现场吊装作业发生意外事故。此外,经过氧化铝结构的优化调整,可增强其牢固性和稳定性,使得氧化铝设备的使用寿命更长,加快了铝业制造活动的稳步运行。
2、安全性。氧化铝吊装已经成为我国铝业发展的重点工程,关系着铝业制造生产效率的提升,推动了社会主义现代化新建、改建和扩建工程的实施。但是,氧化铝吊装存在的病害现象也影响了现场操作的安全性,设备及构件失稳、坍陷等问题不利于现场吊装施工的有序进行,施工单位在吊装前制定处理方案可提升作业的安全性,全面提升了吊装作业的质量。
3、抗害性。金属构件是氧化铝吊装的基本组成,氧化铝结构发生病害对整个吊装作业的质量是极为不利的。施工单位提前采取预防性处理防范,对氧化铝吊装进行加固或改良处理,可有效降低工程病害的发生率[2]。如:吊装作业中定期对可能出现病害的结构做更换、修补处理,可增强工程结构的抗害性能,有助于降低吊装作业病害的发生率。
四、氧化铝吊装的程序及工艺
做好吊装前向所有施工人员进行详细技术交底,务必使作业人员明白作业要求,给吊车司机详细介绍吊装方案,严格按照施工图纸进行施工,严格遵守国家和设计院规定的有关质量标准和操作规程的规定。施工中要坚持自检,互检和专业检查相结合的互检制度,发现问题,及时进行解决。
1、准备。吊车按计划选用配置的要求和主吊臂臂长,主配重总量,将主吊车安装好,吊索按吊装要求挂设好[3]。正式起吊前,检查吊车站位,接杆是否符合要求,支腿的垫铁是否牢固,起重索具穿绕挂设和工具安装是否符合规范要求等,全部检查无误,报吊装总指挥批准后进行试吊。
2、试吊。拆除临时固定索具,指挥吊车缓将设备吊离支撑约200mm,停车检查吊车的受力情况,吊车支腿处地基沉降情况,工索具受力情况,起重指挥信号联系是否畅通无误,如无异常情况,将设备缓慢落回原位准备正式吊装。
3、起吊。指挥吊车缓慢起吊,设备离支撑物约200mm,停车按试车要求检查各部位,如无异常,开始正式起吊[4]。在吊装过程中,随时检查吊车配合作业过程中吊车滑轮组是否垂直受力,吊车支腿的垫设及地基沉降情况等。
4、检查。吊车缓慢将钢结构就位,就位时应密切关注吊车吊臂是否与钢结构碰杆,检查确认操作半径。确认钢结构安装符合要求后,摘除吊索,吊车转场,吊装结束。操作结束后要检查设备与构件的配合程度,确保设备性能的正常发挥。
结论
总之,国内大部分重工业地区正积极实施氧化铝扩建工程,以辅助工业化生产活动的全面开展。氧化铝吊装是一项极为复杂的操作项目,作业期间出现任何问题均会给项目建设带来不利影响。针对氧化铝吊装技术运用存在的不足,企业必须采取综合性的解决方案,从安全、技术、监管等方面营造优越的施工环境。
【参考文献】
[1]候在平.100吨氧化铝扩建工程项目吊装管理的策略[J].冶金制造,2011,32(6):43-45.
[2]姜欣雨.氧化铝厂高压溶出料浆管道焊接制作工艺[J].中小企业管理,2010,18(3):5-8.
[3]朱绍才.浅谈氧化铝构件组合焊接的工艺流程[J].现代机械,2010,23(18):50-52.
[4]黄卫平.氧化铝吊装技术运用的不足及优化[J].山西铝业,2010,17(10):66-68.