论文部分内容阅读
针对既有线CTCS2级列车运行控制系统在广深线的应用,提出了侧线18号道岔发车触发制动的原因分析、站内应答器设置方式、侧线18号道岔接车信号显示方式、临时限速降级显示及下达方式的探讨。
Aiming at the application of existing CTCS2 train operation control system in Guangzhou-Shenzhen line, this paper presents the reasons for the triggering braking of the 18 # turnout on the side line, the setting of the transponder in the station, the signal display mode of the 18 # turnout on the side line, Display and release of the discussion.