论文部分内容阅读
一个新矿山其排水系统设计成功与否,部分取决于预测生产条件的准确性。本文概述了应获得的水量和水质的技术资料,也论述了改善水质的方法。叙述了一些处理矿泥的排泥系统,并列举了实例。根据各种泵影响生产效率和安装及维修费用的设计特点,描述了各种类型的矿用排水泵。并概述了排水管道系统的技术参数。最后对从3000英尺深处排水这一假设的情况研究进行了估算,特别在投资方面。
The success of a drainage system design at a new mine depends in part on the accuracy of the forecast production conditions. This article provides an overview of the technical data on the amount and quality of water that should be obtained and also discusses ways to improve water quality. Described some slime processing sludge system, and cited an example. Various types of mine drainage pumps are described based on design features that affect the production efficiency and installation and maintenance costs of various pumps. And outlines the technical parameters of the drainage system. Finally, a study of the scenario of drainage from a depth of 3000 feet was made, especially in terms of investment.