论文部分内容阅读
为解决锚杆(索)超红线问题,考虑主楼的节点工期要求,特房筼筜·温莎公馆基坑工程采用以下多种支护形式:半逆作法、悬臂桩支护、桩撑支护、桩锚支护等,本文介绍了设计思路及监测结果。随着各地区限制锚杆(索)超红线文件的出台,这可以为解决锚杆(索)超红线问题提供一些启发。
In order to solve the problem of excess red line of anchor rod (cable), taking into account the construction requirements of nodes in the main building, a variety of support forms are adopted for the foundation pit project of the special room Wendeng mansion: semi-inverse method, cantilever pile support, Pile anchor support, this article introduces the design ideas and monitoring results. With the regional restrictions anchor (cable) over the red line document promulgation, which can solve the anchor (cable) super red line to provide some inspiration.