印度铁路对八十年代的运输量、行车速度、线路能力、旧线改建和机车车辆等方面正在作全面规划,总目标是用最少的钱达到最大的运输生产量。此项工作由“研究、设计和标准组织”(以下简称科研组织)着手进行。科研组织在规划中提出的一个重要建议,是在14条重要宽轨线上开行散装货物直达专列。印度铁路现有路网全长50,301公里,轨距混杂,其中1,676毫米轨距的宽轨线约三万公里。电气化线路已有4,397公里,内燃牵引目
The Indian Railways is fully planned for traffic volume, traffic speed, line capacity, old line alteration and rolling stock in the 1980s with the overall goal of achieving the maximum throughput with the least amount of money. This work is carried out by “Research, Design and Standards Organization” (hereinafter referred to as research organizations). An important proposal put forward by the scientific research organizations in the planning is to start the direct operation of bulk cargoes on 14 major wide-track lines. The existing railway network of Indian Railways is 50,301 km in length with a wide range of gauge tracks, of which about 30,000 km are wide gauge tracks with a gauge of 1,676 mm. The electrification line has 4,397 kilometers, the internal combustion traction head