摘要:机电安装工程作为建筑施工项目中的一个重要组成部分,其质量直接影响到建筑物整体设备的安全运行、节能效果及建筑物投入使用后的使用功能,因此直接关系到该建筑的社会效益及经济效益,机电安装工程项目越来越广泛,涉及工业、公用、民用三个部分中的设备安装工程、电气工程、自动化仪表工程、洁净工程、消防工程、智能化工程等等。其整个施工过程从施工人员、设备和材料、施工机具、施工方法、竣工验收各个阶段,都要实行严格管理,以确保质量合格。
关键词:机电安装工程管理
Abstract: the mechanical and electrical installation engineering construction projects as one of the important constituent, its quality directly affect the safety operation of the whole equipment building energy saving effect, and put into use building after use function, so directly related to the construction of social benefits and economic > benefit, mechanical and electrical installation project is more and more extensive, involving industry, utilities, civil three parts of the equipment installation engineering, electrical engineering, industrial automation instrument engineering, clean engineering, fire protection engineering, intelligence engineering and so on. The whole construction process from construction personnel, equipment and materials, construction machinery, construction method, completion acceptance each stage, all want to implement strict management, in order to ensure quality.
Keywords: mechanical and electrical installation project management
中圖分类号: TU85文献标识码:A文章编号:
前言
建筑机电安装工程是建筑工程项目中至关重要的一部分,建筑机电安装工程质量的好坏直接影响着建筑质量的好坏和使用水平的高低。随着社会的进步,人们生活水平的提高和建筑水平的发展,对建筑机电安装工程的要求也越来越高,建筑机电安装工程的主要任务是为用户提供安全、高效、经济、舒适的生活和工作环境。建筑机电安装工程基本上贯穿于整个建筑工程过程中,但其主要部分是在建筑的主题结构工程结束以后才进行施工,并在建筑装修之前就得基本结束,因而具有工期短、边施工边进行的特点。因此,不仅需要健全的工程项目组织,而且要建立严格的工程施工管理体系、机电安装应急预案,同时还要为工程施工过程中所涉及的人力、物力、资金等所需资源提供有力的、充分的保障。
1 图纸设计管理
图纸设计是建筑施工前期最主要的工作,也是整个建筑施工唯一的参考和指导。建筑工程图纸设计工作主要是由建筑投标和招标两方面达成一致的产物,建筑施工者只是在按图纸执行指令。对建筑安装工程施工管理来说,图纸设计管理主要是保证设计图纸的完整性,一方面要求设计图纸数量的完整性;另一方面要求设计图纸内容的完整性。建筑工程施工设计图纸,要充分体现施工设计图的系统性、协调性和有效性。设计图的系统性,要求图纸是系统的图纸,系统的图纸能概略表明各项工程施工的组成系统及联系关系。设计图的协调性,要求各项工程图纸之间能相互说明,互为解释。说明各种设备、设施的平面位置、说明各种设备的工作原理、说明各种原材料的特性、参数的设备材料表。各图纸的标注重复是允许的,但必须保证这些标注的协调一致,保证各图纸之间的协调一致是高层建筑工程施工设计的重要方面。高层建筑工程施工图纸的有效性,必须在设计单位的资格证书允许范围内的设计,这样才是有效合法的设计施工图纸,才可成为施工结算的有效依据。
2 组织管理
建筑机电安装工程施工管理中组织管理的重要性是不言而喻的。组织管理的成败直接关系着这个工程是否能按时保质完成。
为了更好的实施组织管理,我们应该建立适宜的、具有良好执行力的组织团队,并做好组织管理计划和责任分工,;根据实际情况建立简洁、畅通的组织沟通渠道,以保证信息的及时、全面、真实的传输和反馈,同时应注意合理、及时的解决组织管理中的矛盾冲突和意见分歧,;加强团队整体的理论水平,保证组织管理的权利和义务落实。
3合同管理
施工单位在接到顾客的招标文件之后,根据用户要求并结合自己的主客观条件对合同的内容进行评审,核实工程实物量,对施工过程中可能发生的工程变更及相关的成本费用的支出、施工方法、质量要求、机械设备的使用、材料供应、劳动力调配和工期目标等诸方面进行合理评估,正确合理地编制施工图预算,在编制施工图预算时要深入研究招标文件和合同内容,充分考虑可能发生的费用,包括合同规定的属于包干性质的各项定额补贴,并将其列入施工图预算。但不能将项目管理不善造成的损失也列入施工图预算,更不能违反政策高估冒算或乱收费。
工程管理,“七分准备,三分施工”。合同签订后,工程管理人员负责按规定办理工程开工手续,并与甲方协商提供施工所用的动力来源(如水、电、风等)和施工人员所须的休息和进餐的场所,并根据甲乙双方的要求签订安全防火协议;察看施工场地,确定设备及材料运输车辆的道路是否通畅。按照顾客要求及实际情况确定开工及竣工时间,根据工程量及施工设备情况配备施工作业人员,制订施工网络计划。划定施工区域,做好安全保卫工作:制订安全技术措施,向施工人员进行安全技术交底。
4 施工进度管理
建筑机电安装工程的施工是在装修施工开始之前进行的,并需要在装修开始时结束,所以其进度会影响整个建筑工程的施工进度。建筑机电安装工程施工的进度管理是反映整个施工队伍组织水平的高低,反应能力的快慢,施工设备的利用率等各个方面。建筑机电安装工程的施工进度管理需要将施工总计划中的各个小部分目标和控制点按施工工程分解到每一项、每一天的工程目标中,并严格按照计划编制详细的日计划、周计划、旬计划、月计划,并在明天休工之前半小时召开施工总结、协调会议,总结当天的工作完成情况,安排接下来的工作开展计划。项目管理者必须不定时检查施工进度,督促施工者按照计划完成相应工作。保证机电安装工程按期竣工。
5质量管理
由于工序质量、分项或分部工程的质量形成并决定工程的最终质量,并且最终质量是一次性的,不可更改的。因此,作为大型机电安装项目的质量管理,必须有一个健全完善的质量管理体系,从工程实体形成阶段、施工层次和影响的施工流程、施工工艺、施工方法、人员素质、机具设备、施工环境、材料进场和使用等方面,对质量控制进行全面策划和控制。因此,有必要成立以项目负责人为主,生产副经理、项目总工程师、相关职能部门负责人、工长和各分包负责人构成的质量控制管理体系。
6安全管理
安全是所用工作最重要的管理,建筑机电安装工程也不例外。建筑机电安装施工工程中如果安全管理不当,将会造成严重的财产、人身损失,其后果是无法想象的。建筑机电安装工程的安全控制,可以从以下方面入手:首先做好施工操作者的专业技术和安全知识培训,增强安全防范意识;其次,建立完善的安全保障体系,充分配置安全控制所需要的消防设备,并不定时的对消防设施、设备进行全面的检查和更换;第三,施工管理者要严格按照相关标准进行安全体系建设,做好安全防范,及时发现并消除安全隐患,将建筑机电安装工程施工过程中一切安全问题扼杀在萌芽状态。
7机电安装工程竣工结算管理
机电安装工程项目已完工,并已經过验收签证,交工资料已整理汇总完毕并经有关责任方签字认可;施工图预算以及应调整的工程造价已编制完毕;设计变更等技术核定单等签证手续已办完;因建设单位原因造成的人员窝工、机具闲置、工期延误等经济索赔已得到建设单位认可后,项目部即可向工程发包方进行最终的工程价款结算。发包方与承包方按照签订的具有法律效力的工程合同和补充协议,以及国家有关部门颁发的相关文件规定和标准等进行竣工决算。
竣工验收阶段由建设单位编制竣工结算报告,以实物数量和货币指标为计量单位,综合反映竣工项目从筹建开始到项目竣工交付使用为止的全部建设费、建设成果和财务情况的总结性文件。收集整理和分析有关依据资料填写竣工结算报表。
8结语
综上所述,机电安装工程作为建筑施工项目中一个重要部分,与人民生活和国家发展息息相关。提高建筑的舒适性、安全性、高效性,其实机电安装至关重要。机电安装项目管理是一个动态管理过程,在整个过程中还要对工程材料、设备采购、特种设备及作业、施工机具、技术档案资料,以及回访保修有大量的数据和信息需要处理,这就要求建立计算机系统及其数据库,以达到工程管理水平的不断提高。
参考文献: [1] 黄志彬.建筑机电设备安装管理问题的几点思考.《价值工程》.2010.12,113
[4] 杨林.浅析建筑机电工程的施工管理.《中小企业管理与科技》.2010年第24期
注:文章内所有公式及图表请用PDF形式查看。
关键词:机电安装工程管理
Abstract: the mechanical and electrical installation engineering construction projects as one of the important constituent, its quality directly affect the safety operation of the whole equipment building energy saving effect, and put into use building after use function, so directly related to the construction of social benefits and economic > benefit, mechanical and electrical installation project is more and more extensive, involving industry, utilities, civil three parts of the equipment installation engineering, electrical engineering, industrial automation instrument engineering, clean engineering, fire protection engineering, intelligence engineering and so on. The whole construction process from construction personnel, equipment and materials, construction machinery, construction method, completion acceptance each stage, all want to implement strict management, in order to ensure quality.
Keywords: mechanical and electrical installation project management
中圖分类号: TU85文献标识码:A文章编号:
前言
建筑机电安装工程是建筑工程项目中至关重要的一部分,建筑机电安装工程质量的好坏直接影响着建筑质量的好坏和使用水平的高低。随着社会的进步,人们生活水平的提高和建筑水平的发展,对建筑机电安装工程的要求也越来越高,建筑机电安装工程的主要任务是为用户提供安全、高效、经济、舒适的生活和工作环境。建筑机电安装工程基本上贯穿于整个建筑工程过程中,但其主要部分是在建筑的主题结构工程结束以后才进行施工,并在建筑装修之前就得基本结束,因而具有工期短、边施工边进行的特点。因此,不仅需要健全的工程项目组织,而且要建立严格的工程施工管理体系、机电安装应急预案,同时还要为工程施工过程中所涉及的人力、物力、资金等所需资源提供有力的、充分的保障。
1 图纸设计管理
图纸设计是建筑施工前期最主要的工作,也是整个建筑施工唯一的参考和指导。建筑工程图纸设计工作主要是由建筑投标和招标两方面达成一致的产物,建筑施工者只是在按图纸执行指令。对建筑安装工程施工管理来说,图纸设计管理主要是保证设计图纸的完整性,一方面要求设计图纸数量的完整性;另一方面要求设计图纸内容的完整性。建筑工程施工设计图纸,要充分体现施工设计图的系统性、协调性和有效性。设计图的系统性,要求图纸是系统的图纸,系统的图纸能概略表明各项工程施工的组成系统及联系关系。设计图的协调性,要求各项工程图纸之间能相互说明,互为解释。说明各种设备、设施的平面位置、说明各种设备的工作原理、说明各种原材料的特性、参数的设备材料表。各图纸的标注重复是允许的,但必须保证这些标注的协调一致,保证各图纸之间的协调一致是高层建筑工程施工设计的重要方面。高层建筑工程施工图纸的有效性,必须在设计单位的资格证书允许范围内的设计,这样才是有效合法的设计施工图纸,才可成为施工结算的有效依据。
2 组织管理
建筑机电安装工程施工管理中组织管理的重要性是不言而喻的。组织管理的成败直接关系着这个工程是否能按时保质完成。
为了更好的实施组织管理,我们应该建立适宜的、具有良好执行力的组织团队,并做好组织管理计划和责任分工,;根据实际情况建立简洁、畅通的组织沟通渠道,以保证信息的及时、全面、真实的传输和反馈,同时应注意合理、及时的解决组织管理中的矛盾冲突和意见分歧,;加强团队整体的理论水平,保证组织管理的权利和义务落实。
3合同管理
施工单位在接到顾客的招标文件之后,根据用户要求并结合自己的主客观条件对合同的内容进行评审,核实工程实物量,对施工过程中可能发生的工程变更及相关的成本费用的支出、施工方法、质量要求、机械设备的使用、材料供应、劳动力调配和工期目标等诸方面进行合理评估,正确合理地编制施工图预算,在编制施工图预算时要深入研究招标文件和合同内容,充分考虑可能发生的费用,包括合同规定的属于包干性质的各项定额补贴,并将其列入施工图预算。但不能将项目管理不善造成的损失也列入施工图预算,更不能违反政策高估冒算或乱收费。
工程管理,“七分准备,三分施工”。合同签订后,工程管理人员负责按规定办理工程开工手续,并与甲方协商提供施工所用的动力来源(如水、电、风等)和施工人员所须的休息和进餐的场所,并根据甲乙双方的要求签订安全防火协议;察看施工场地,确定设备及材料运输车辆的道路是否通畅。按照顾客要求及实际情况确定开工及竣工时间,根据工程量及施工设备情况配备施工作业人员,制订施工网络计划。划定施工区域,做好安全保卫工作:制订安全技术措施,向施工人员进行安全技术交底。
4 施工进度管理
建筑机电安装工程的施工是在装修施工开始之前进行的,并需要在装修开始时结束,所以其进度会影响整个建筑工程的施工进度。建筑机电安装工程施工的进度管理是反映整个施工队伍组织水平的高低,反应能力的快慢,施工设备的利用率等各个方面。建筑机电安装工程的施工进度管理需要将施工总计划中的各个小部分目标和控制点按施工工程分解到每一项、每一天的工程目标中,并严格按照计划编制详细的日计划、周计划、旬计划、月计划,并在明天休工之前半小时召开施工总结、协调会议,总结当天的工作完成情况,安排接下来的工作开展计划。项目管理者必须不定时检查施工进度,督促施工者按照计划完成相应工作。保证机电安装工程按期竣工。
5质量管理
由于工序质量、分项或分部工程的质量形成并决定工程的最终质量,并且最终质量是一次性的,不可更改的。因此,作为大型机电安装项目的质量管理,必须有一个健全完善的质量管理体系,从工程实体形成阶段、施工层次和影响的施工流程、施工工艺、施工方法、人员素质、机具设备、施工环境、材料进场和使用等方面,对质量控制进行全面策划和控制。因此,有必要成立以项目负责人为主,生产副经理、项目总工程师、相关职能部门负责人、工长和各分包负责人构成的质量控制管理体系。
6安全管理
安全是所用工作最重要的管理,建筑机电安装工程也不例外。建筑机电安装施工工程中如果安全管理不当,将会造成严重的财产、人身损失,其后果是无法想象的。建筑机电安装工程的安全控制,可以从以下方面入手:首先做好施工操作者的专业技术和安全知识培训,增强安全防范意识;其次,建立完善的安全保障体系,充分配置安全控制所需要的消防设备,并不定时的对消防设施、设备进行全面的检查和更换;第三,施工管理者要严格按照相关标准进行安全体系建设,做好安全防范,及时发现并消除安全隐患,将建筑机电安装工程施工过程中一切安全问题扼杀在萌芽状态。
7机电安装工程竣工结算管理
机电安装工程项目已完工,并已經过验收签证,交工资料已整理汇总完毕并经有关责任方签字认可;施工图预算以及应调整的工程造价已编制完毕;设计变更等技术核定单等签证手续已办完;因建设单位原因造成的人员窝工、机具闲置、工期延误等经济索赔已得到建设单位认可后,项目部即可向工程发包方进行最终的工程价款结算。发包方与承包方按照签订的具有法律效力的工程合同和补充协议,以及国家有关部门颁发的相关文件规定和标准等进行竣工决算。
竣工验收阶段由建设单位编制竣工结算报告,以实物数量和货币指标为计量单位,综合反映竣工项目从筹建开始到项目竣工交付使用为止的全部建设费、建设成果和财务情况的总结性文件。收集整理和分析有关依据资料填写竣工结算报表。
8结语
综上所述,机电安装工程作为建筑施工项目中一个重要部分,与人民生活和国家发展息息相关。提高建筑的舒适性、安全性、高效性,其实机电安装至关重要。机电安装项目管理是一个动态管理过程,在整个过程中还要对工程材料、设备采购、特种设备及作业、施工机具、技术档案资料,以及回访保修有大量的数据和信息需要处理,这就要求建立计算机系统及其数据库,以达到工程管理水平的不断提高。