论文部分内容阅读
水电站是现代水力发电工程不可缺少的方式,对水电站工程实施优化改造可促进水力发电功能升级,带动了传统产业结构的优化升级。设计是水力发电工程建设的初始阶段,从设计环节对水电站工程采取改造措施,极大地推动了新型水电站作业模式形成。当前,可持续发展观要求水电站走节能化道路,水工建筑物与机电设备是水电站的两大组成部分。文章分析了节能化思想在水工建筑与机电设备改造中的应用情况。
Hydropower station is an indispensable way for modern hydropower projects. The optimization and reformation of hydropower projects can promote the upgrading of hydropower and promote the optimization and upgrading of the traditional industrial structure. Design is the initial stage of hydropower engineering construction, from the design aspects of the hydropower project to take transformation measures, which greatly promoted the formation of a new hydropower operation mode. Currently, the concept of sustainable development requires hydropower stations to take the road of energy-saving. Hydraulic structures and mechanical and electrical equipment are two major components of hydropower stations. The paper analyzes the application of energy-saving ideas in the hydraulic construction and mechanical and electrical equipment transformation.