论文部分内容阅读
本文介绍了流滩坝灯泡式发电机轴承的参数选择及几个主要问题的解决方法与结构特点,并与引进的 ELIN 公司马回电站机组轴承作了比较。最后总结出大型灯泡式机组轴承设计的几点体会。
This paper introduces the selection of the parameters and structural features of several main problems in the lamp bank generator of Runanba Dam and compares them with the imported bearings of ELIN Ma Hui Power Plant unit. Finally summed up the large bulb-type unit bearing design experience.