不同初始状态下压实粉土的CBR试验研究

来源 :公路 | 被引量 : 0次 | 上传用户:quintentwc93
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
粉土工程性质不良,粉土填筑路堤的强度和稳定性与不同压实状态下粉土的工程力学性质息息相关。为评价粉土路基强度,针对路基粉土的工程力学特性,对不同初始状态下的压实粉土试样进行了击实试验和CBR(承载比)试验,分析不同初始含水量下的粉土在不同击实次数下击实后的力学性能,探讨击实次数相同时压实粉土CBR值随初始含水量变化的关系以及初始含水量相同时压实粉土CBR值随击实次数的关系。比较了相同初始状态的压实粉土浸水和不浸水CBR强度的差异。研究结果表明,击实次数相同的压实粉土试样不浸水CBR值随初始含水量增大而减小,浸水CBR值随初始含水量变化出现峰值,峰值含水量基本上与该击实次数下的最优含水量一致。初始含水量越低,试样浸水前后的CBR值变化越大,试样接近饱和时,浸水和不浸水CBR值基本没有差异。各初始含水量下的压实粉土试样其CBR值随击实次数变化没有特定的规律性,与初始含水量的大小有关。 The silt works are of poor quality. The strength and stability of silt filled embankments are closely related to the mechanics of silt under different compaction conditions. In order to evaluate the strength of silt subgrade, according to the engineering mechanics characteristics of subgrade, the compaction test and CBR test of compacted silty soil under different initial conditions were carried out. The effects of silt under different initial water contents The mechanical properties at different compaction times were investigated to investigate the relationship between the CBR values ​​of compacted silts and the initial water content when the compaction times were the same and the relationship between the CBR value of compacted silts and the number of compaction times when the initial water content was the same . Comparisons of differences in CBR strength between compacted silt soil and non-flooded soil of the same initial state were made. The results show that the CBR value of compacted silt samples with the same number of compaction times decreases with the increase of initial water content. The CBR value of infiltration has a peak with the change of initial water content, and the peak water content is basically the same as the number of compaction times The optimal water content under the same. The lower the initial water content, the greater the change of CBR value before and after immersion of the sample. When the sample is close to saturation, there is almost no difference in the CBR value of the immersed and not immersed water. The CBR values ​​of compacted silt samples under initial water content have no regularity with the number of compaction times, which is related to the initial water content.
其他文献
以某在建的大跨径钢桁梁悬索桥为例,对比研究了柔性中央扣系统的构造和设置方法,并基于大型通用有限元分析程序ANSYS对锚箱式和耳板式两种中央扣斜拉索梁端锚固系统进行了空
对传统悬索桥主缆防护技术及新型主缆防护技术—S形钢丝+干空气除湿系统进行简要概述,重点介绍了S形钢丝国产化的进展情况及润扬长江公路大桥S形钢丝+干空气除湿系统主缆防护
以一座墩高相差较大的装配式桥梁为例,基于Midas Civil程序采用非线性时程分析方法进行E2地震作用下抗震验算。计算结果表明:全部采用板式橡胶支座时E2地震作用下矮墩抗剪能
在中小跨径混凝土装配式梁桥的横向设计上,日本有着成功的经验,美国一直借鉴学习,目前也取得了很好的效果。国外与我国该类桥梁横向设计的主要区别在于配有横向预应力束,而我
近些年,高速公路复线工程愈来愈多,使得高速公路复线与原路形成竞争性路网,受现状收费制式、复线行程距离等影响,通道内部转移至复线的交通需求较少,造成一定的道路资源浪费
三塔悬索桥与两塔悬索桥相比,具有更大的跨越能力,其结构行为与两塔悬索桥有很大的不同,主要表现在中塔对全桥结构行为的影响。以52m+2×650m+52m三塔悬索桥方案为例,阐述了
在系统分析山区农村公路交通安全的影响因素基础上,针对弯道段和直线段特点,分别提出了交通特性、公路横断面、公路平纵线形或交通特性、道路条件为指标的评价体系。在此基础
传统的桥墩病害一般采用钢筋混凝土增大截面加固法,但恒载增加量较多,对桩基和承台受力不利。而碳纤维棒高强度聚合物纤维加固法,用高强碳纤维棒作为受力配筋,具有轻质高强的
先张法板梁具有受力合理、构件轻巧、工艺简单、工序少、预制速度快、运输简捷、安装方便、节省锚具和波纹管、工程造价低、以及不因堵孔或压浆不密实而影响结构耐久性等诸多
进度目标是公路建设项目的主要目标,传统的公路工程项目建设进度管理缺乏动态的调整与更新,已经凸显出各种弊端。最后计划者技术是将传统的“推式”系统转变为“拉式”系统进