1.问题的提出。 根据河南省建设厅豫建价[1993]5号文《关于调整河南省建筑安装工程概预算定额人工费的通知》和河南省建设厅豫建人[1993]123号文转发建设部《关于调整建筑安装工程流动施工津贴标准的通知》,确定建筑安装工程的取费。首先要计算人工费增加额和流动施工津贴。计算时既要统计定额人工费,又要统计综合工日数,这就给预算工作者增加了一倍的工作量,[见表(1)(2)]有时甚至会出现统计工作中的差错,影响了工
1. The question is raised. According to Henan Provincial Department of Construction Henan Construction Price [1993] No. 5, Circular on Adjusting the Estimated Labor Cost for Henan Construction Installation and Installation Projects and Henan Provincial Department of Construction Yu Jianren [1993] No. The notice of the construction and installation project flow construction allowance standard shall determine the fee for the construction and installation project. First, calculate the increase in labor costs and flow construction allowances. When calculating, both the fixed labor fee and the number of integrated labor days must be counted. This doubles the workload of the budget worker. [See Table (1) (2)] Sometimes errors may occur in the statistical work. Affected workers