论文部分内容阅读
衡阳北编组场担负着京广、湘桂2条干线的列车解编任务,运输较繁忙,解编作业量较大。由于衡阳北是一个雷害严重的地区,2003年至2004年共发生雷害26次,其中19次造成防雷设施损坏9次损坏了计算机控制设备,直接影响编组场作业的安全和效率。特别是2005年6月17日14∶25因受强雷电击,
Hengyang North Marshalling Field is responsible for the Beijing-Guangzhou, Hunan and Guangxi trunk two lines of the task of disassembly, transportation is more busy, a large amount of disassembly. As Hengyang North is a heavily damaged area, a total of 26 lightning strikes occurred between 2003 and 2004, of which 19 caused damage to the lightning protection facilities nine times and damaged computer control equipment, which directly affected the safety and efficiency of the yard operation. In particular, at 14:25 on June 17, 2005 due to a lightning strike,