论文部分内容阅读
杆塔工程中杆塔组立必须有完整的施工技术设计。组立过程中,应采取不导致部件变形或损坏的措施。杆塔基础和拉线基础的钢筋混凝土工程施工及验收,应现行国家标准《混凝土结构工程施工质量验收规范》的有关规定。
Tower construction in the tower must have a complete construction technology design. During assembly, measures should be taken not to cause deformation or damage to the components. The construction and acceptance of the reinforced concrete foundation of the tower foundation and the foundation of the pull line shall be in accordance with the relevant provisions of the current national standard “Code for Acceptance of Construction Quality of Concrete Structures”.