摘要:现代城市建设进程的加快使得建筑工程量不断增加,在建筑施工技術不断提升的同时,人们对于建筑工程的质量提出了更为严格的要求。不仅要求工程质量达标,还需要在视觉上给人以艺术效果,且在外形上也期望建筑以独特、新颖、复杂的建筑型态展现出来,这一系列审美观念的转变着实给建筑单位带来了施工难题。
关键词:斜屋面的混凝土施工;屋面防水技术
Abstract: the modern city construction the quickening of the process of construction project that continuously increased, in building construction technology of increased at the same time, people for architectural engineering quality proposed a more strict requirements. Requirements engineering quality not only, still need the person gives on the vision with artistic effect, and in appearance and expect the building with unique, innovative, complex building type show come out, this a series of the transformation of the notion of aesthetic was building unit brought the construction problems.
Keywords: inclined roofing of concrete construction; Roof waterproof technology
中图分类号: TU528文献标识码:A文章编号:
引言
质量是建筑工程的核心,没有质量的工程是失败的。若施工单位不能保证工程质量合格,则会耗费大量的人力、物力、财力,还将影响到施工单位的信誉形象,难以在同行竞争中占有优势。遇到异常情况要科学分析后制定可行的解决措施,以保证建筑工程能够满足实际要求。
1.斜屋面的混凝土施工
1.1斜屋面是现代化建筑物运用较多的一种形式,其坡度通常为40°~60°范围内。当斜屋面使用双面支模后,由于其板厚通常较小,不超过120mm;由于钢筋过于密集、间距较小,使得施工过程中的振动棒难以插入,而模板的加固处理也十分困难,导致施工成本增加,施工进度变慢。
1.2针对这一问题,则需要使用单面支模的方式进行浇筑。
考虑到斜屋面坡度较大,混凝土在振捣时很容易出现下滑,这就会导致混凝土表面凹凸不平、振捣不密实,形成蜂窝、孔洞及麻面等状态,从而导致使斜屋面混凝土的施工质量无法得到保证,不合格率较高。在长期施工实践中,综合各方面因素不断研究思考后制定了一整套施工方案,详细操作工艺流程包括:
1.21避雷针。于在屋脊和坡底的避雷针的上方标识引测的标高,而避雷针则应使用塑料布包紧,避免受到混凝土泥浆污染;
1.22模板。对模板面进行全面清理,收集需要用到的器具。
1.23混凝土。自上至下进行浇筑混凝土,而混凝土在屋脊部位从泵管输出后向下流动,混凝土在流动时需采取梁和柱的振捣。
1.24抹平表面。混凝土面依据从下往上的顺序抹平,把坡面剩余的混凝土用铁锹至未浇筑的地方。
1.25振捣。在稍干1 h后,使用平板振捣器自下至上振捣,这一阶段混凝土接近初凝时间,而其流动性正逐渐降低,混凝土振捣之后仅表面少量的混凝土往下流淌,这时只要把流淌下的混凝土用铁板往上用力抹平并施压即可。
1.26再次抹平。在完成振捣之后需拉好麻线,再次用2 m长铝合金抹平混凝土面。
1.27分次抹平。使用木蟹抹面,实施分次抹平。
2.在施工过程中,应该注意:
2.1优先选择固定泵浇筑,泵管沿屋脊布设,泵管架搭设高度控制在500 mm左右。
2.2在能满足泵送要求的前提下,混凝土坍落度应尽可能低,高度为25m左右时一般约为(100±20)mm,具体坍落度应根据实际情况及时调整。
2.3应配备足够的人员和振动机具,保证在混凝土初凝之前完成混凝土的找平工作。
2.4浇筑混凝土前,避雷针等尖状物应用塑料套管保护,模板面应保持干燥,柱子位置应做好标识,在有条件的情况下应提前浇筑柱子混凝土。
2.5浇筑混凝土过程中,坡底檐口四周应设临时挡板,防止混凝土外滑,振捣完毕后拆除。
2.6应控制混凝土浇筑速度,避免浇筑过快导致后续工作衔接不利。
2.7平面振捣器振捣时应分段进行,找平和抹面工作应从上往下进行。
2.8若有内檐沟,安装模板时沟底和沟面应封并加焊压顶钢筋以抗浮,避免混凝土流入沟内。
2.9混凝土浇筑过程中应派专人负责看模和看铁,及时修整损坏的部位。当坍落度暂时调整不到理想状态时应在钢筋上绑扎方木以便于行走和减小混凝土下滑速度,方木间距约为500mm,平板振捣器振捣前拆除方木。
3.屋面防水施工技术
3.1分格缝的设置及做法 分格缝应设置在屋面板的支承端,屋面转折处、防水层与突出屋面的交接处,并应与屋面板缝对齐,使防水层因温差的影响,砼干缩结构变形等因素造成的防水层裂缝,集中到分格缝处,以免板面开裂。分格缝的设置间距不宜过大,当大于6m时,应在中部设一“v”形分格缝,分格缝深度宜贯穿整个防水层厚度。当分格缝兼作排气道时,缝可适当加宽,并设排气孔出气,当屋面采用石油、沥青、油毡作防水层时,分格缝处应加200mm~300mm宽的油毡,用沥青胶单边点贴,分格缝内嵌填满油膏。
3.2 屋面找平层做法 屋面采用建筑找坡与结构找坡相结合的做法。先按3%的结构找坡后,再在结构层上用1:6水泥炉渣或水泥膨胀砼石找坡,再做25mm厚1:2.5水泥砂浆找平层,建筑找坡时,一定要找准泛水坡度,流水方向,将最高点与泄水口之间用鱼线拉直、打点、打巴、泄水口处厚度不得低于30mm。浇砌时,一定要用滚筒和尺方滚、压赶、使其密实。
3.3 屋面隔离层的做法 在施工中因地制宜,取长补短,把面上的这一层二布三油卷材防水层做在找平层与刚性层之间,既起了隔离层的作用,又不被日晒雨淋,既防止油膏老化,又起了防水作用。在做卷材防水层施工时,应注意好以下几点:
3.31 基层上涂刮基层处理剂,要求薄而均匀,一般干燥后,当不粘手才能铺贴卷材。
3.32 卷材防水层的铺贴一般应由层面最低标高处向上平行屋脊施工,使卷材按水流方向搭接,当屋面坡度大于10%时,卷材应垂直于屋脊方向铺贴。
3.33 铺贴方法:剥开卷材脊面的隔离纸,将卷材粘贴于基层表面,卷材长边搭接保持50mm,短边搭接保持70mm,卷材要求保持自然松弛状态,不要拉得过紧,卷材铺妥后,应立即用平面振动器全面压实,垂直部位用橡胶榔头敲实。
3.34 卷材搭接粘结:卷材压实后,将搭接部位掀开,用油漆刷将搭接粘接剂均匀涂刷,在掀开卷材接头之两个粘接面,涂后干燥片刻手感不粘时,即可进行粘合,再用橡胶榔头敲压密实,以免开缝造成漏水。
3.35防水层施工温度选择5℃以上为宜。
3.4 钢筋网片及细石砼刚性防水层的做法 在混凝土防水层中,应配双向5@200×200的冷拔钢筋网片,并在分格缝处断开,以增强防水层刚度和板块的整体性,钢筋网片在防水层中的布置应在尽量偏上的部位,因为防水层表面受温差变化影响大而易产生裂缝,同时考虑表面碳化对钢筋的影响,因此,钢筋网片的保护层厚度不得小于10mm。
3.41细石砼防水层的强度等级不应小于C25,且应采用机械搅拌,机械振捣,砼的水灰比不应大于0.55,水泥标号不应低于425#。砼的厚度不应小于40mm,如过薄,砼失水很快,水泥不能充分水化,从而降低砼的抗渗性能。防水层的表面处理要重视,面板要求厚薄一致,排水坡度要符合规范要求,砼收水后进行二次压光,以切断和封闭砼中的毛细管,提高抗渗性。抹压面层时,严禁在表面洒水,加水泥漿或撒干水泥,以防龟裂脱皮降低防水效果。
3.42防水砼浇筑12小时~24小时,即可进行养护,覆盖时间不小于14小时。养护初期不得上人,砼的养护是细石砼防水层的极其重要的最后一道工序。养护不好会造成砼早期脱水,不但降低砼的强度,而且会由于干缩引起砼内部裂缝表面起砂,使抗渗性能大幅度降低。
3.43屋面泛水、滴水、管道周边以及其它节点严格按设计图纸和技术规范施工,泛水平整光滑,滴水无缺棱掉角,管道周边做到嵌缝密实,表面密封处理,檐口顶粱和外侧面事先找平及粉刷面层,做好水电管路、避雷带的预埋工作,严禁在混凝土板浇捣后随意凿打。对个别后置穿板管道周边,必须二次分层灌浆,孔洞应凿成上大下小的喇叭口,光滑塑料管应先拉毛表面后安装,确保与混凝土的粘结力和密实性。
4.总结
从调查资料显示,施工质量不合格的负面影响主要体现在:减慢工程进度,使工程留下安全隐患;缩短寿命,让建筑物禁受不住风吹雨打。面对诸多的施工质量问题,工程技术人员应提高自己的责任意识,积极采用先进的施工技术与方案来保证工程质量,严格按照工程操作标准完成施工任务。在施工中,施工技术人员认真把关,各施工人员和各工序的密切配合是施工质量保证体系的必备条件。
参考文献
1.杜庆强.屋面防水工程施工质量的控制[J].中小企业管理与科技.2009.03
2.廉红霞.建筑防水工程技术现状与展望[J].山西建筑.2005.31(6):146-147.
3.廖品槐。建筑工程质量与安全管理[M].北京:中国建筑工业出版社,2005.
4.向明,吴晓燕。对于建筑工程中施工技术应用分析[J].四川建材,2009,(01)。
5.唐金育。建筑工程预应力施工技术的探讨[J].科技风,2010,(05)。
关键词:斜屋面的混凝土施工;屋面防水技术
Abstract: the modern city construction the quickening of the process of construction project that continuously increased, in building construction technology of increased at the same time, people for architectural engineering quality proposed a more strict requirements. Requirements engineering quality not only, still need the person gives on the vision with artistic effect, and in appearance and expect the building with unique, innovative, complex building type show come out, this a series of the transformation of the notion of aesthetic was building unit brought the construction problems.
Keywords: inclined roofing of concrete construction; Roof waterproof technology
中图分类号: TU528文献标识码:A文章编号:
引言
质量是建筑工程的核心,没有质量的工程是失败的。若施工单位不能保证工程质量合格,则会耗费大量的人力、物力、财力,还将影响到施工单位的信誉形象,难以在同行竞争中占有优势。遇到异常情况要科学分析后制定可行的解决措施,以保证建筑工程能够满足实际要求。
1.斜屋面的混凝土施工
1.1斜屋面是现代化建筑物运用较多的一种形式,其坡度通常为40°~60°范围内。当斜屋面使用双面支模后,由于其板厚通常较小,不超过120mm;由于钢筋过于密集、间距较小,使得施工过程中的振动棒难以插入,而模板的加固处理也十分困难,导致施工成本增加,施工进度变慢。
1.2针对这一问题,则需要使用单面支模的方式进行浇筑。
考虑到斜屋面坡度较大,混凝土在振捣时很容易出现下滑,这就会导致混凝土表面凹凸不平、振捣不密实,形成蜂窝、孔洞及麻面等状态,从而导致使斜屋面混凝土的施工质量无法得到保证,不合格率较高。在长期施工实践中,综合各方面因素不断研究思考后制定了一整套施工方案,详细操作工艺流程包括:
1.21避雷针。于在屋脊和坡底的避雷针的上方标识引测的标高,而避雷针则应使用塑料布包紧,避免受到混凝土泥浆污染;
1.22模板。对模板面进行全面清理,收集需要用到的器具。
1.23混凝土。自上至下进行浇筑混凝土,而混凝土在屋脊部位从泵管输出后向下流动,混凝土在流动时需采取梁和柱的振捣。
1.24抹平表面。混凝土面依据从下往上的顺序抹平,把坡面剩余的混凝土用铁锹至未浇筑的地方。
1.25振捣。在稍干1 h后,使用平板振捣器自下至上振捣,这一阶段混凝土接近初凝时间,而其流动性正逐渐降低,混凝土振捣之后仅表面少量的混凝土往下流淌,这时只要把流淌下的混凝土用铁板往上用力抹平并施压即可。
1.26再次抹平。在完成振捣之后需拉好麻线,再次用2 m长铝合金抹平混凝土面。
1.27分次抹平。使用木蟹抹面,实施分次抹平。
2.在施工过程中,应该注意:
2.1优先选择固定泵浇筑,泵管沿屋脊布设,泵管架搭设高度控制在500 mm左右。
2.2在能满足泵送要求的前提下,混凝土坍落度应尽可能低,高度为25m左右时一般约为(100±20)mm,具体坍落度应根据实际情况及时调整。
2.3应配备足够的人员和振动机具,保证在混凝土初凝之前完成混凝土的找平工作。
2.4浇筑混凝土前,避雷针等尖状物应用塑料套管保护,模板面应保持干燥,柱子位置应做好标识,在有条件的情况下应提前浇筑柱子混凝土。
2.5浇筑混凝土过程中,坡底檐口四周应设临时挡板,防止混凝土外滑,振捣完毕后拆除。
2.6应控制混凝土浇筑速度,避免浇筑过快导致后续工作衔接不利。
2.7平面振捣器振捣时应分段进行,找平和抹面工作应从上往下进行。
2.8若有内檐沟,安装模板时沟底和沟面应封并加焊压顶钢筋以抗浮,避免混凝土流入沟内。
2.9混凝土浇筑过程中应派专人负责看模和看铁,及时修整损坏的部位。当坍落度暂时调整不到理想状态时应在钢筋上绑扎方木以便于行走和减小混凝土下滑速度,方木间距约为500mm,平板振捣器振捣前拆除方木。
3.屋面防水施工技术
3.1分格缝的设置及做法 分格缝应设置在屋面板的支承端,屋面转折处、防水层与突出屋面的交接处,并应与屋面板缝对齐,使防水层因温差的影响,砼干缩结构变形等因素造成的防水层裂缝,集中到分格缝处,以免板面开裂。分格缝的设置间距不宜过大,当大于6m时,应在中部设一“v”形分格缝,分格缝深度宜贯穿整个防水层厚度。当分格缝兼作排气道时,缝可适当加宽,并设排气孔出气,当屋面采用石油、沥青、油毡作防水层时,分格缝处应加200mm~300mm宽的油毡,用沥青胶单边点贴,分格缝内嵌填满油膏。
3.2 屋面找平层做法 屋面采用建筑找坡与结构找坡相结合的做法。先按3%的结构找坡后,再在结构层上用1:6水泥炉渣或水泥膨胀砼石找坡,再做25mm厚1:2.5水泥砂浆找平层,建筑找坡时,一定要找准泛水坡度,流水方向,将最高点与泄水口之间用鱼线拉直、打点、打巴、泄水口处厚度不得低于30mm。浇砌时,一定要用滚筒和尺方滚、压赶、使其密实。
3.3 屋面隔离层的做法 在施工中因地制宜,取长补短,把面上的这一层二布三油卷材防水层做在找平层与刚性层之间,既起了隔离层的作用,又不被日晒雨淋,既防止油膏老化,又起了防水作用。在做卷材防水层施工时,应注意好以下几点:
3.31 基层上涂刮基层处理剂,要求薄而均匀,一般干燥后,当不粘手才能铺贴卷材。
3.32 卷材防水层的铺贴一般应由层面最低标高处向上平行屋脊施工,使卷材按水流方向搭接,当屋面坡度大于10%时,卷材应垂直于屋脊方向铺贴。
3.33 铺贴方法:剥开卷材脊面的隔离纸,将卷材粘贴于基层表面,卷材长边搭接保持50mm,短边搭接保持70mm,卷材要求保持自然松弛状态,不要拉得过紧,卷材铺妥后,应立即用平面振动器全面压实,垂直部位用橡胶榔头敲实。
3.34 卷材搭接粘结:卷材压实后,将搭接部位掀开,用油漆刷将搭接粘接剂均匀涂刷,在掀开卷材接头之两个粘接面,涂后干燥片刻手感不粘时,即可进行粘合,再用橡胶榔头敲压密实,以免开缝造成漏水。
3.35防水层施工温度选择5℃以上为宜。
3.4 钢筋网片及细石砼刚性防水层的做法 在混凝土防水层中,应配双向5@200×200的冷拔钢筋网片,并在分格缝处断开,以增强防水层刚度和板块的整体性,钢筋网片在防水层中的布置应在尽量偏上的部位,因为防水层表面受温差变化影响大而易产生裂缝,同时考虑表面碳化对钢筋的影响,因此,钢筋网片的保护层厚度不得小于10mm。
3.41细石砼防水层的强度等级不应小于C25,且应采用机械搅拌,机械振捣,砼的水灰比不应大于0.55,水泥标号不应低于425#。砼的厚度不应小于40mm,如过薄,砼失水很快,水泥不能充分水化,从而降低砼的抗渗性能。防水层的表面处理要重视,面板要求厚薄一致,排水坡度要符合规范要求,砼收水后进行二次压光,以切断和封闭砼中的毛细管,提高抗渗性。抹压面层时,严禁在表面洒水,加水泥漿或撒干水泥,以防龟裂脱皮降低防水效果。
3.42防水砼浇筑12小时~24小时,即可进行养护,覆盖时间不小于14小时。养护初期不得上人,砼的养护是细石砼防水层的极其重要的最后一道工序。养护不好会造成砼早期脱水,不但降低砼的强度,而且会由于干缩引起砼内部裂缝表面起砂,使抗渗性能大幅度降低。
3.43屋面泛水、滴水、管道周边以及其它节点严格按设计图纸和技术规范施工,泛水平整光滑,滴水无缺棱掉角,管道周边做到嵌缝密实,表面密封处理,檐口顶粱和外侧面事先找平及粉刷面层,做好水电管路、避雷带的预埋工作,严禁在混凝土板浇捣后随意凿打。对个别后置穿板管道周边,必须二次分层灌浆,孔洞应凿成上大下小的喇叭口,光滑塑料管应先拉毛表面后安装,确保与混凝土的粘结力和密实性。
4.总结
从调查资料显示,施工质量不合格的负面影响主要体现在:减慢工程进度,使工程留下安全隐患;缩短寿命,让建筑物禁受不住风吹雨打。面对诸多的施工质量问题,工程技术人员应提高自己的责任意识,积极采用先进的施工技术与方案来保证工程质量,严格按照工程操作标准完成施工任务。在施工中,施工技术人员认真把关,各施工人员和各工序的密切配合是施工质量保证体系的必备条件。
参考文献
1.杜庆强.屋面防水工程施工质量的控制[J].中小企业管理与科技.2009.03
2.廉红霞.建筑防水工程技术现状与展望[J].山西建筑.2005.31(6):146-147.
3.廖品槐。建筑工程质量与安全管理[M].北京:中国建筑工业出版社,2005.
4.向明,吴晓燕。对于建筑工程中施工技术应用分析[J].四川建材,2009,(01)。
5.唐金育。建筑工程预应力施工技术的探讨[J].科技风,2010,(05)。