微机编制全路零担车组织计划和全路篷布调度微机管理信息系统两项成果,于1990年8月通过了铁道部技术鉴定。沈阳铁路局吉林科研所完成的微机编制全路零担车组织计划,使零担运输过程模式化和计算方法程序化,克服了手工编制时的工作量大、速度慢、占用人员多、误差率高的老大难问题。并能保存和提供中间结果,为优化方案和调整方案提供了可能。该系统自1987年投入运用以来,零担直达率提高,中转比重下降,为实现各零担中转站畅通无堵起到了积极作用,并提高了零担车的静载重,创年经济效益上亿元。全路蓬布调度微机管理信息系统是由吉林科研所和沈阳铁路局货运处合作完成的成果。它实现了部与12个铁路局间以微机远程通信网
Computer compilation all the way LTL organization plan and the whole tarpaulin scheduling computer management information system two results, in August 1990 passed the Ministry of Railways technology appraisal. Shenyang Railway Bureau, Jilin Institute of Science completed the preparation of the entire computer LTL organization plan, so that LTL process modeization and calculation methods of programming to overcome the manual preparation of the workload, slow, occupy more staff, the error rate is high The crux of the problem. And can save and provide intermediate results, to optimize the program and adjust the program offers the possibility. Since the system was put into operation in 1987, the direct share of LTL increased and the proportion of transit decreased. This system has played an active role in achieving unblocking of LTL terminals and increased the LTL load-bearing capacity. Pengbu scheduling throughout the computer management information system by the Jilin Institute and the Shenyang Railway Administration Cargo Department completed the cooperation results. It achieved the ministry with 12 railway bureau to computer remote communication network