摘 要:园林绿化工程中的施工管理是工程的重要组成部分,如果没有做好施工管理,就会使设计人员的设计意图、绿化美观效果体现不出来。施工过程中出现的问题不能忽视,必须及时提出相应的解决措施,才能够保证园林绿化工程的施工质量,并在此基础上结合园林绿化工程的科学性、艺术性及技术性,使得该园林工程既经济实用又美观。
关键词:园林绿化工程;施工问题;对策
Abstract: The construction management in garden greening project is an important part of the project, if there is no good construction management, it will enable the design intention, reflect the green beautiful effect does not come out. The problems existing in the construction process can not be ignored, must be timely put forward the corresponding settlement measures, to ensure the construction quality of the landscape project, and based on a combination of garden greening engineering science, art and technology, which makes the garden project is economical and practical and beautiful.
Key words: landscape engineering construction; problem; countermeasure
中图分类号:TU986.3
随着经济的发展和城市的扩建,城市人口对环境的要求越来越高,提倡回归自然,重视生态环境。人们从满足生态与审美要求的角度出发,种植花草、布置园林格局,使得园林绿化工程迅速发展,但是在发展的过程中也出现了不少问题,尤其是施工质量问题,远达不到设计人员所描绘的绿化美观效果,反而劳民伤财,因此园林绿化工程的施工问题亟需得到处理。
1 园林绿化施工中存在的问题
1.1 施工队伍良莠不齐
由于绿化施工技术含量不高,大部分施工队伍是有农民、工人组成,他们认为绿化施工只是种树和铺草而已,不重视施工过程,只注重其可观的经济利益,从而导致无法达到相应的施工标准。
1.2 施工图不完善
目前园林绿化工程主要以中小型工程居多,设计人员不够重视,所绘制的图纸不够完整,经常只有方案图和平面图,甚至有时只有简单的文字说明。这种简单的设计导致施工人员与设计人员的图纸无法深度交流,不能充分理解设计者的意图,使得园林绿化施工具有随意性而达不到设计目的。
1.3 施工过程中施工人员考虑不周全
园林绿化施工看似简单,实际上是一些比较细致的工作,但这往往被施工人员忽略。他们有时考虑不到植物本身特点,或是进行反季节施工,或是将阴性植物种在阳光下,而阳性的栽在阴凉地方,违背了其生长习性,影响其生长,容易导致各种虫害和病害的产生,植株死亡率较高。
1.4没有考虑植物习性
在园林绿化工程施工中,或者由于设计人员原因,或者施工人员原因,很多情况下没有考虑植物习性或者考虑得不周到。比如:将阳性植物栽在荫蔽处、将阴性植物栽在强光下、将不耐涝植物栽在阴湿处、将不耐污染植物栽在工矿区和道路广场处等。由于违背了植物的生长习性,导致植物生长势不强,容易产生各种各样的病害、虫害。
1.5植物修剪不合理
由于常常进行反季节施工,在炎热天气施工,或者起挖、运输标准达不到,为了保证成活,就需要对植物进行重剪,导致修剪过量,枝叶删剪太多,严重破坏了树形树冠,使得建成绿地毫无绿化景观。另外,没有考虑植物是否耐修剪,比如雪松、广玉兰萌芽发枝力弱,破坏树形后再难形成丰满树冠,就不达到设计要求。
1.6没有施工方案或施工方案不详细
目前园林工程很多情况下没有施工方案,或者施工方案不详细、不具体,使得园林工程具有随意性,完全取决于项目经理和技术人员,甲方和监理人员无从管理,只能看情况办事。
1.7常常反季节施工且工期短
当前的园林绿化工程一般都不会考虑植物的生长规律,多数是反季节施工,虽然现在施工技术和措施已很完善,但对植物的生长仍然是极为不利的,植株死亡率很高。另外,绿化工程工期非常短,多数工程均要求在2个月内甚至更短的时间内完工,而在短时间内往往无法考虑到土壤的科学处理、设计的进一步完善、植物的选择等全面的工作,这极大地影响施工质量和植物成活率。
1.8后期养护措施不到位
后期养护措施不到位也是常见的情况,比如:不设支撑或支撑不合理,起不到支撑效果; 没有及时中耕除杂,导致绿化杂草丛生;没有正确进行浇水、施肥,导致绿地植物缺素症状明显,病虫害严重等,严重地影响绿化景观。
1.9种植土壤达不到要求,地形没有按标准进行处理
尽管目前人们普遍认识到土壤、地形设计是园林绿化工程的前提和基础,但是在具体实施过程中,施工方为了节约造价和赶进度,种植土壤大多数情况下没有达到《绿化工程施工规范》要求,有的甚至没做地形设计,导致目前很多绿地内植物生长不良。
2 做好园林绿化工程中的施工管理措施
2.1 建立专业化的施工队伍
要想做好一个良好的园林绿化工程,建立一支专业化的施工队伍非常重要。要求施工队伍首先要从心里重视绿化工程,秉承严谨的工作态度,科学严谨地进行施工;其次是要求他们持证上岗,具有良好技术管理水平;再次是施工队伍需定期进行培训,强化施工质量意识,严格实施各项工作。
2.2 要有完善施工图纸
一是要求施工单位必须具有绿化施工资质,否则不允许其进行绿化施工活动。二是建议绿化主管部门推行招投标机制,允许具有相应资质和良好业绩的施工单位参加。三是建立一套完整的施工标准和施工圖集,促使设计人员绘制完善的施工图,减少施工人员与设计人员的交流障碍。
2.3 加强施工管理
首先做好前期工作,详细解读施工图,充分了解设计人员的设计意图,编制详细的施工组织计划,这样才能在保证施工质量的条件下加快施工进度。其次是严格按照施工图进行施工,保证施工质量。再次是重视植株的生长特点,设计人员要与施工人员进行交流沟通,共同做好这项绿化工程。最后是做好其后期养护工作,才能保证持久的绿化美观效果。
2.4 保证足够的工期
植物有其自身的生命周期。只有确保园林绿化工程中每个环节的实施,才能保证工程的施工质量,因此,除特别紧急情况,应该保证绿化工程有足够的施工时间。勉强加快施工进度,更容易导致不断返工、提高建设成本而又达不到预定的绿化美观效果。
2.5推行园林绿化工程项目监理制
推行园林绿化工程项目监理制是园林绿化工程质量管理与控制的保障。随着园林绿化工程建设的不断完善,园林绿化工程监理制已全面进人园林绿化工程施工行业。园林绿化工程监理是一种高智能的技术服务,遵循科学准则,以科学态度,采用科学的方法进行工作。园林绿化监理工程师既维护业主的利益,又维护施工单位的利益,做到守法、诚信、公正、科学,从而保证了工程施工质量。园林绿化监理人员从工程施工到工程竣工验收,能够做到全过程跟踪,一旦发现不合格材料、工序和产品,及时整改,以确保园林绿化工程每个环节运作流畅,从而保证了园林绿化工程施工质量。
2.6实行预验收制度
园林绿化工程交业主验收前,项目部、公司质检部门先按标准进行预验收;施工过程中,对半成品、乔灌木进行货源地预验收。以此增强业主信心,减少现场验收程序,确保施工进度。
2.7园林绿化工程应大力推行标准化、规范化施工
园林绿化工程应该参照建筑施工,建立起一套完整的施工标准,不但要按《园林绿化工程施工规范》、《园林绿化工程施工质量检验评定标准》验收,还要求施工前有完整施工图和技术交底,编制出详细的施工组织设计,做好充足的施工准备(包括人、工具、设备、环境等),按要求做好“三格制”,施工中认真填写有关资料表格,竣工后园林有整套竣工资料,否则不验收。
2.8实行招投标制
要求绿化主管部门对达到一定规模的绿化工程,必须实行招投标制。允许具有绿化施工资质和相应的绿化施工业绩的施工单位参加,实行优胜劣汰制,淘汰施工质量差、信誉不好的施工单位。即便是小规模的绿化工程的施工,也必须具备绿化施工资质,无资质者,不允许从事绿化工程的施工活动。
3 结语
综上所述,园林绿化工程在现代城市规划理念的指导下带来了良好的生态与社会效益,但在其快速发展的过程中暴露不少问题,尤其是施工管理问题。本文通过分析当前绿化施工过程中普遍存在的问题,提出了今后施工中的管理措施,以确保施工质量。
参考文献:
[1]莫旭芬,郑娴.园林工程施工过程中应注意的问题[J].中国高新技术企业,2009(11).
[2]雷燕峰,王所.园林绿化工程施工管理的几点思考[J].中国科技新产品,2010(13):213.
关键词:园林绿化工程;施工问题;对策
Abstract: The construction management in garden greening project is an important part of the project, if there is no good construction management, it will enable the design intention, reflect the green beautiful effect does not come out. The problems existing in the construction process can not be ignored, must be timely put forward the corresponding settlement measures, to ensure the construction quality of the landscape project, and based on a combination of garden greening engineering science, art and technology, which makes the garden project is economical and practical and beautiful.
Key words: landscape engineering construction; problem; countermeasure
中图分类号:TU986.3
随着经济的发展和城市的扩建,城市人口对环境的要求越来越高,提倡回归自然,重视生态环境。人们从满足生态与审美要求的角度出发,种植花草、布置园林格局,使得园林绿化工程迅速发展,但是在发展的过程中也出现了不少问题,尤其是施工质量问题,远达不到设计人员所描绘的绿化美观效果,反而劳民伤财,因此园林绿化工程的施工问题亟需得到处理。
1 园林绿化施工中存在的问题
1.1 施工队伍良莠不齐
由于绿化施工技术含量不高,大部分施工队伍是有农民、工人组成,他们认为绿化施工只是种树和铺草而已,不重视施工过程,只注重其可观的经济利益,从而导致无法达到相应的施工标准。
1.2 施工图不完善
目前园林绿化工程主要以中小型工程居多,设计人员不够重视,所绘制的图纸不够完整,经常只有方案图和平面图,甚至有时只有简单的文字说明。这种简单的设计导致施工人员与设计人员的图纸无法深度交流,不能充分理解设计者的意图,使得园林绿化施工具有随意性而达不到设计目的。
1.3 施工过程中施工人员考虑不周全
园林绿化施工看似简单,实际上是一些比较细致的工作,但这往往被施工人员忽略。他们有时考虑不到植物本身特点,或是进行反季节施工,或是将阴性植物种在阳光下,而阳性的栽在阴凉地方,违背了其生长习性,影响其生长,容易导致各种虫害和病害的产生,植株死亡率较高。
1.4没有考虑植物习性
在园林绿化工程施工中,或者由于设计人员原因,或者施工人员原因,很多情况下没有考虑植物习性或者考虑得不周到。比如:将阳性植物栽在荫蔽处、将阴性植物栽在强光下、将不耐涝植物栽在阴湿处、将不耐污染植物栽在工矿区和道路广场处等。由于违背了植物的生长习性,导致植物生长势不强,容易产生各种各样的病害、虫害。
1.5植物修剪不合理
由于常常进行反季节施工,在炎热天气施工,或者起挖、运输标准达不到,为了保证成活,就需要对植物进行重剪,导致修剪过量,枝叶删剪太多,严重破坏了树形树冠,使得建成绿地毫无绿化景观。另外,没有考虑植物是否耐修剪,比如雪松、广玉兰萌芽发枝力弱,破坏树形后再难形成丰满树冠,就不达到设计要求。
1.6没有施工方案或施工方案不详细
目前园林工程很多情况下没有施工方案,或者施工方案不详细、不具体,使得园林工程具有随意性,完全取决于项目经理和技术人员,甲方和监理人员无从管理,只能看情况办事。
1.7常常反季节施工且工期短
当前的园林绿化工程一般都不会考虑植物的生长规律,多数是反季节施工,虽然现在施工技术和措施已很完善,但对植物的生长仍然是极为不利的,植株死亡率很高。另外,绿化工程工期非常短,多数工程均要求在2个月内甚至更短的时间内完工,而在短时间内往往无法考虑到土壤的科学处理、设计的进一步完善、植物的选择等全面的工作,这极大地影响施工质量和植物成活率。
1.8后期养护措施不到位
后期养护措施不到位也是常见的情况,比如:不设支撑或支撑不合理,起不到支撑效果; 没有及时中耕除杂,导致绿化杂草丛生;没有正确进行浇水、施肥,导致绿地植物缺素症状明显,病虫害严重等,严重地影响绿化景观。
1.9种植土壤达不到要求,地形没有按标准进行处理
尽管目前人们普遍认识到土壤、地形设计是园林绿化工程的前提和基础,但是在具体实施过程中,施工方为了节约造价和赶进度,种植土壤大多数情况下没有达到《绿化工程施工规范》要求,有的甚至没做地形设计,导致目前很多绿地内植物生长不良。
2 做好园林绿化工程中的施工管理措施
2.1 建立专业化的施工队伍
要想做好一个良好的园林绿化工程,建立一支专业化的施工队伍非常重要。要求施工队伍首先要从心里重视绿化工程,秉承严谨的工作态度,科学严谨地进行施工;其次是要求他们持证上岗,具有良好技术管理水平;再次是施工队伍需定期进行培训,强化施工质量意识,严格实施各项工作。
2.2 要有完善施工图纸
一是要求施工单位必须具有绿化施工资质,否则不允许其进行绿化施工活动。二是建议绿化主管部门推行招投标机制,允许具有相应资质和良好业绩的施工单位参加。三是建立一套完整的施工标准和施工圖集,促使设计人员绘制完善的施工图,减少施工人员与设计人员的交流障碍。
2.3 加强施工管理
首先做好前期工作,详细解读施工图,充分了解设计人员的设计意图,编制详细的施工组织计划,这样才能在保证施工质量的条件下加快施工进度。其次是严格按照施工图进行施工,保证施工质量。再次是重视植株的生长特点,设计人员要与施工人员进行交流沟通,共同做好这项绿化工程。最后是做好其后期养护工作,才能保证持久的绿化美观效果。
2.4 保证足够的工期
植物有其自身的生命周期。只有确保园林绿化工程中每个环节的实施,才能保证工程的施工质量,因此,除特别紧急情况,应该保证绿化工程有足够的施工时间。勉强加快施工进度,更容易导致不断返工、提高建设成本而又达不到预定的绿化美观效果。
2.5推行园林绿化工程项目监理制
推行园林绿化工程项目监理制是园林绿化工程质量管理与控制的保障。随着园林绿化工程建设的不断完善,园林绿化工程监理制已全面进人园林绿化工程施工行业。园林绿化工程监理是一种高智能的技术服务,遵循科学准则,以科学态度,采用科学的方法进行工作。园林绿化监理工程师既维护业主的利益,又维护施工单位的利益,做到守法、诚信、公正、科学,从而保证了工程施工质量。园林绿化监理人员从工程施工到工程竣工验收,能够做到全过程跟踪,一旦发现不合格材料、工序和产品,及时整改,以确保园林绿化工程每个环节运作流畅,从而保证了园林绿化工程施工质量。
2.6实行预验收制度
园林绿化工程交业主验收前,项目部、公司质检部门先按标准进行预验收;施工过程中,对半成品、乔灌木进行货源地预验收。以此增强业主信心,减少现场验收程序,确保施工进度。
2.7园林绿化工程应大力推行标准化、规范化施工
园林绿化工程应该参照建筑施工,建立起一套完整的施工标准,不但要按《园林绿化工程施工规范》、《园林绿化工程施工质量检验评定标准》验收,还要求施工前有完整施工图和技术交底,编制出详细的施工组织设计,做好充足的施工准备(包括人、工具、设备、环境等),按要求做好“三格制”,施工中认真填写有关资料表格,竣工后园林有整套竣工资料,否则不验收。
2.8实行招投标制
要求绿化主管部门对达到一定规模的绿化工程,必须实行招投标制。允许具有绿化施工资质和相应的绿化施工业绩的施工单位参加,实行优胜劣汰制,淘汰施工质量差、信誉不好的施工单位。即便是小规模的绿化工程的施工,也必须具备绿化施工资质,无资质者,不允许从事绿化工程的施工活动。
3 结语
综上所述,园林绿化工程在现代城市规划理念的指导下带来了良好的生态与社会效益,但在其快速发展的过程中暴露不少问题,尤其是施工管理问题。本文通过分析当前绿化施工过程中普遍存在的问题,提出了今后施工中的管理措施,以确保施工质量。