【摘 要】在人类建筑史中,倾斜高层建筑与建筑行业发展中其他建筑体系相比十分特别。在倾斜高层建筑的施工过程中,施工单位必须保证关键阶段的施工质量,并合理选择和使用预设值和结构的初始位形等方式,从而加强对倾斜高层建筑施工关键问题的控制,落实好施工策略。为更好地保障倾斜高层建筑的施工效果,论文针对倾斜高层建筑施工的关键问题进行研究,并提出倾斜高层建筑施工中的一些关键点。
【Abstract】In the history of human architecture, inclined high-rise buildings are very special compared to other building systems in the development of building industry. In the construction process of inclined high-rise building, the construction unit must ensure the construction quality of the key stage, and reasonably select and use the preset value, the initial configuration of the structure and other methods, so as to strengthen the control of the key problems in the construction of inclined high-rise building, and implement the construction strategy well. In order to better ensure the construction effect of inclined high-rise building, this paper studies the key problems of the inclined high-rise building construction, and puts forward some key points in the inclined high-rise building construction.
【关键词】倾斜高层建筑;施工关键问题;实施对策
【Keywords】inclined high-rise building; key construction problems; implementation countermeasures
【中图分类号】TU974 【文献标志码】A 【文章编号】1673-1069(2021)07-0190-02
1 引言
倾斜的建筑物在本质上是不符合自然规律的,可以说倾斜建筑体系是与重力持续进行抵抗的产物。正因为其“叛逆”的特点,在建筑施工的过程中施工单位必须加强对建筑物的结构负荷的关注,要防止因为负荷的增加而导致在建筑结构上的变形。目前,在施工中常常通过非线性效应来对建筑物的结构进行全面考虑,并针对组件的位置和加工尺寸进行确定,从而保证施工计划的精确性和可行性。相对于其他的建筑体系而言,倾斜高层建筑施工体系难度和复杂度都大大增加,所以在施工之中应该注重对设计方案的编制。本文针对倾斜高层建筑施工关键问题进行研究,探讨其具体的实施对策。
2 倾斜高层建筑各阶段施工形态分析
倾斜高层建筑的设计与施工经历了多个阶段,每个阶段对应不同的形态位形,包括建筑结构形态位形和施工初期形态类型。倾斜高层建筑各阶段施工形态主要包括以下4个方面。
2.1 考虑内外部结构情况
在对倾斜高层建筑进行施工前必须加强对其设計工作,而在其开展设计工作的过程中必须保证设计人员能够了解到倾斜高层建筑各阶段施工的具体要点,明确在各个施工环节的建筑形态,同时,设计人员必须着重考虑倾斜建筑物的内部和外部结构,明确不同施工环境和条件下建筑体的内部结构情况,特别是针对机电设备、管道工程、照明系统等重要的系统,这是提高倾斜高层建筑施工质量的重点所在,也是设计工作者必须完成的工作[1]。
2.2 明确建筑结构的初始位置
为更好地保证建筑工程的施工质量,在开始施工之前必须要求建筑团队充分地了解建筑工程的结构形态,同时,应该充分地了解建筑结构的初始位置。在明确结构位置之后,施工单位需要通过设计方案来进行分析和计算,确定结构荷载,这一点可以通过迭代计算来获得。在具体的施工过程中,施工团队必须满足建筑的相关需求,必须获取详细的结构变化资料,在供应商的配合下分析结构的变形情况,明确不同结构部分的荷载情况,并且做好对各个结构构件的安装工作,进而更好地满足业主的相关需求。当然,在施工人员确定好不同结构的初始位置后,其还需要根据当前的施工流程来选择科学的施工工艺,要加强对建筑物各结构形态分布的计算和分析,获取到完整的数据资料之后才能够开启下一步的施工[2]。 2.3 掌握分步安装方法的使用规范
由于现阶段很多工程都采用了分步安装方法来完成工程施工,而对于倾斜高层建筑工程来说,如果其施工过程使用的是分步安装方法,那么为了保证施工质量和精确度,施工单位必须明确每一步施工的结构位置,针对部分位置变化的结构进行重新计算和分析,确保组件的位置和安装坐标能够得到明确,最终更好地保证结构的位置合理准确。
2.4 定义预设值
在一次加载过程中必然会存在较大的差异,所以施工单位在使用相应的计算方法时必须做好研究,针对建筑项目中计算得出的结果进行处理,并且将施工过程中产生的负荷的累积效应考虑在预设值中,确保实际加工尺寸与组件设计尺寸之间的误差能够尽量减小。当然,实际上加工尺寸和预设尺寸之间的区别主要就是在于预设值的问题,而每个建筑结构的载荷要求都不一致,所以在设计零件的过程中必须考虑到其承载力的问题,并且用于同一加工目标的零件的长度也不同,预设值的处理将更加重要。倾斜高层建筑物因为其结构的特殊性,所以在建筑物结构侧很容易就受到弯矩的影响,所以其预设值会有相应的增加,这就导致零件的实际加工尺寸与计算出的构件尺寸具有更大的差异。为减少倾斜高层建筑物因为其自身所具有的坡度而引起的结构变形问题,特别是在柱的工作长度大于实际计算的长度时,施工团队必须在施工完成后才可以做好对具体位置的确定工作,这是保证工作精度和实际处理误差最小的最好方法。在建造倾斜高层结构时,施工团队还需要加强对结构变形的预测,并且明确在不同施工阶段的内力分布情况,这将极大地影响倾斜建筑物的建设效果[3]。
3 倾斜高层建筑施工的实施要点
3.1 加强对加工预调值的计算
一般来说,倾斜高层建筑的主体建筑载荷与总体结构是处于不断变化中的,其变化主要是因为建筑物之间的状态将极大地影响到结构的变化,导致结构变形而影响到建筑的整体稳定性。以中央电视台总部大楼为例进行分析,其前后塔的合拢状态将极大地影响其结构的稳定性,所以这就意味着必须加强对预调值的计算,保证预调值的计算结果能够尽可能精确,从而更好地确定加工和安装的位置。当然,要想确保预调值的精确度,需要加强对算法的应用。
首先是针对初始位形和构建原理的算法问题,可以通过ANSYS大型分析软件来更新位置坐标,并将结构变形中获得的位形作为预设值,将反向符号覆盖在设计位形上从而获得第一个设计原始位形,而其也在下一次的迭代中作为参考值。其次是确定安装位置。在分步安装方法中,安装位置的确定需要在上述初始位形的基础上施加相应的载荷,在通过多方面载荷的计算后可以得到安装的位置。当然,施工团队还需要以施工相反的顺序去撤除载荷,计算新的结构位形和构件的内部强度,这种反向拆卸方法可以有效地获取不同阶段的结构构造和内部强度。
最后是确定加工预调值,在获取到分步安装位形之后就需要找到组件处理的预设值以及组件的实际处理时间,通过对相应节点对应的位形曲线的分析可以获得零件的加工尺寸。
3.2 控制结构变形与超大悬臂安装技术
因为在载荷增加的情况下建筑体的结构将会发生变形的情况,而变形的情况一旦发生就不会停止,这也就意味着如果不及时地加以控制就会导致后续施工存在较大的问题,甚至会存在倒塌的风险。基于此,施工单位需要对变形进行控制,加强对建筑结构仿真的计算。施工单位需要以结构为出发点,选择合适的钢结构来安装建筑结构,并且在施工之中要尽量减少安装的误差,确保钢结构安装的精准度,同时,可以有效地控制建筑工程的施工水平和施工质量,确保各个结构的合理和准确。当然,施工单位还需要准确地处理加工预调值,要明确各个结构的变形情况和应力分布。在具体的施工过程中,还需要施工单位能够安装好监控点和感应器。
另外,在倾斜高层建筑体系的建设中,超大悬臂安装技术是十分常见的技术,其在使用过程中必须根据建筑的具体需求,在对构件进行组装和吊装的过程中需要尽量减少自身的合拢与延伸的情况,保证建筑结构的稳定性。因为超大悬臂技术的应用范围越大则使用上愈加困难,所以可以通过智能化技术或者GPS技术来对超大悬臂技术的应用进行实时监控,确保该技术可以在较好的监控条件下进行应用,保证其能够在短时间内进行合拢。
4 结语
综上所述,本文探讨了倾斜高层建筑施工中的一些关键问题和注意要点,并提出了关于倾斜高层建筑施工中的技术应用要点。可以说倾斜高层建筑的设计和建设极大地考验了施工团队的能力,而建筑设计的水平也反映出我国国民经济的发展和人们的需求,所以为满足更多的建筑需求,我国各建筑企业还需要强化自身的能力,提高中国当代建筑工程的水平。
【参考文献】
【1】朱静,周宝东.倾斜高层建筑施工关键问题及实施[J].居舍,2020(35):63-64+58.
【2】康婧.某高層住宅倾斜原因分析[J].住宅科技,2020,40(6):67-69.
【3】郭彦林,董全利.倾斜高层建筑施工关键问题及实施[J].施工技术,2006(12):6-9.
【Abstract】In the history of human architecture, inclined high-rise buildings are very special compared to other building systems in the development of building industry. In the construction process of inclined high-rise building, the construction unit must ensure the construction quality of the key stage, and reasonably select and use the preset value, the initial configuration of the structure and other methods, so as to strengthen the control of the key problems in the construction of inclined high-rise building, and implement the construction strategy well. In order to better ensure the construction effect of inclined high-rise building, this paper studies the key problems of the inclined high-rise building construction, and puts forward some key points in the inclined high-rise building construction.
【关键词】倾斜高层建筑;施工关键问题;实施对策
【Keywords】inclined high-rise building; key construction problems; implementation countermeasures
【中图分类号】TU974 【文献标志码】A 【文章编号】1673-1069(2021)07-0190-02
1 引言
倾斜的建筑物在本质上是不符合自然规律的,可以说倾斜建筑体系是与重力持续进行抵抗的产物。正因为其“叛逆”的特点,在建筑施工的过程中施工单位必须加强对建筑物的结构负荷的关注,要防止因为负荷的增加而导致在建筑结构上的变形。目前,在施工中常常通过非线性效应来对建筑物的结构进行全面考虑,并针对组件的位置和加工尺寸进行确定,从而保证施工计划的精确性和可行性。相对于其他的建筑体系而言,倾斜高层建筑施工体系难度和复杂度都大大增加,所以在施工之中应该注重对设计方案的编制。本文针对倾斜高层建筑施工关键问题进行研究,探讨其具体的实施对策。
2 倾斜高层建筑各阶段施工形态分析
倾斜高层建筑的设计与施工经历了多个阶段,每个阶段对应不同的形态位形,包括建筑结构形态位形和施工初期形态类型。倾斜高层建筑各阶段施工形态主要包括以下4个方面。
2.1 考虑内外部结构情况
在对倾斜高层建筑进行施工前必须加强对其设計工作,而在其开展设计工作的过程中必须保证设计人员能够了解到倾斜高层建筑各阶段施工的具体要点,明确在各个施工环节的建筑形态,同时,设计人员必须着重考虑倾斜建筑物的内部和外部结构,明确不同施工环境和条件下建筑体的内部结构情况,特别是针对机电设备、管道工程、照明系统等重要的系统,这是提高倾斜高层建筑施工质量的重点所在,也是设计工作者必须完成的工作[1]。
2.2 明确建筑结构的初始位置
为更好地保证建筑工程的施工质量,在开始施工之前必须要求建筑团队充分地了解建筑工程的结构形态,同时,应该充分地了解建筑结构的初始位置。在明确结构位置之后,施工单位需要通过设计方案来进行分析和计算,确定结构荷载,这一点可以通过迭代计算来获得。在具体的施工过程中,施工团队必须满足建筑的相关需求,必须获取详细的结构变化资料,在供应商的配合下分析结构的变形情况,明确不同结构部分的荷载情况,并且做好对各个结构构件的安装工作,进而更好地满足业主的相关需求。当然,在施工人员确定好不同结构的初始位置后,其还需要根据当前的施工流程来选择科学的施工工艺,要加强对建筑物各结构形态分布的计算和分析,获取到完整的数据资料之后才能够开启下一步的施工[2]。 2.3 掌握分步安装方法的使用规范
由于现阶段很多工程都采用了分步安装方法来完成工程施工,而对于倾斜高层建筑工程来说,如果其施工过程使用的是分步安装方法,那么为了保证施工质量和精确度,施工单位必须明确每一步施工的结构位置,针对部分位置变化的结构进行重新计算和分析,确保组件的位置和安装坐标能够得到明确,最终更好地保证结构的位置合理准确。
2.4 定义预设值
在一次加载过程中必然会存在较大的差异,所以施工单位在使用相应的计算方法时必须做好研究,针对建筑项目中计算得出的结果进行处理,并且将施工过程中产生的负荷的累积效应考虑在预设值中,确保实际加工尺寸与组件设计尺寸之间的误差能够尽量减小。当然,实际上加工尺寸和预设尺寸之间的区别主要就是在于预设值的问题,而每个建筑结构的载荷要求都不一致,所以在设计零件的过程中必须考虑到其承载力的问题,并且用于同一加工目标的零件的长度也不同,预设值的处理将更加重要。倾斜高层建筑物因为其结构的特殊性,所以在建筑物结构侧很容易就受到弯矩的影响,所以其预设值会有相应的增加,这就导致零件的实际加工尺寸与计算出的构件尺寸具有更大的差异。为减少倾斜高层建筑物因为其自身所具有的坡度而引起的结构变形问题,特别是在柱的工作长度大于实际计算的长度时,施工团队必须在施工完成后才可以做好对具体位置的确定工作,这是保证工作精度和实际处理误差最小的最好方法。在建造倾斜高层结构时,施工团队还需要加强对结构变形的预测,并且明确在不同施工阶段的内力分布情况,这将极大地影响倾斜建筑物的建设效果[3]。
3 倾斜高层建筑施工的实施要点
3.1 加强对加工预调值的计算
一般来说,倾斜高层建筑的主体建筑载荷与总体结构是处于不断变化中的,其变化主要是因为建筑物之间的状态将极大地影响到结构的变化,导致结构变形而影响到建筑的整体稳定性。以中央电视台总部大楼为例进行分析,其前后塔的合拢状态将极大地影响其结构的稳定性,所以这就意味着必须加强对预调值的计算,保证预调值的计算结果能够尽可能精确,从而更好地确定加工和安装的位置。当然,要想确保预调值的精确度,需要加强对算法的应用。
首先是针对初始位形和构建原理的算法问题,可以通过ANSYS大型分析软件来更新位置坐标,并将结构变形中获得的位形作为预设值,将反向符号覆盖在设计位形上从而获得第一个设计原始位形,而其也在下一次的迭代中作为参考值。其次是确定安装位置。在分步安装方法中,安装位置的确定需要在上述初始位形的基础上施加相应的载荷,在通过多方面载荷的计算后可以得到安装的位置。当然,施工团队还需要以施工相反的顺序去撤除载荷,计算新的结构位形和构件的内部强度,这种反向拆卸方法可以有效地获取不同阶段的结构构造和内部强度。
最后是确定加工预调值,在获取到分步安装位形之后就需要找到组件处理的预设值以及组件的实际处理时间,通过对相应节点对应的位形曲线的分析可以获得零件的加工尺寸。
3.2 控制结构变形与超大悬臂安装技术
因为在载荷增加的情况下建筑体的结构将会发生变形的情况,而变形的情况一旦发生就不会停止,这也就意味着如果不及时地加以控制就会导致后续施工存在较大的问题,甚至会存在倒塌的风险。基于此,施工单位需要对变形进行控制,加强对建筑结构仿真的计算。施工单位需要以结构为出发点,选择合适的钢结构来安装建筑结构,并且在施工之中要尽量减少安装的误差,确保钢结构安装的精准度,同时,可以有效地控制建筑工程的施工水平和施工质量,确保各个结构的合理和准确。当然,施工单位还需要准确地处理加工预调值,要明确各个结构的变形情况和应力分布。在具体的施工过程中,还需要施工单位能够安装好监控点和感应器。
另外,在倾斜高层建筑体系的建设中,超大悬臂安装技术是十分常见的技术,其在使用过程中必须根据建筑的具体需求,在对构件进行组装和吊装的过程中需要尽量减少自身的合拢与延伸的情况,保证建筑结构的稳定性。因为超大悬臂技术的应用范围越大则使用上愈加困难,所以可以通过智能化技术或者GPS技术来对超大悬臂技术的应用进行实时监控,确保该技术可以在较好的监控条件下进行应用,保证其能够在短时间内进行合拢。
4 结语
综上所述,本文探讨了倾斜高层建筑施工中的一些关键问题和注意要点,并提出了关于倾斜高层建筑施工中的技术应用要点。可以说倾斜高层建筑的设计和建设极大地考验了施工团队的能力,而建筑设计的水平也反映出我国国民经济的发展和人们的需求,所以为满足更多的建筑需求,我国各建筑企业还需要强化自身的能力,提高中国当代建筑工程的水平。