吉林省水能资源蕴藏量丰富,全省按设计标准选定适合修建水电站的工程地点共计有662处。目前,吉林省在(拟)建大中型水利水电工程项目约有30余处。多年来,吉林省水利水电工程建设征地补偿和移民安置得到妥善处理,水库移民按时迁出了库区,得到妥善安置,水利水电工程建设顺利,库区和移民安置区社会总体和谐稳定。
Jilin Province has ample reserves of hydropower resources and a total of 662 engineering sites selected for construction of hydropower stations in the province according to design standards. At present, Jilin Province is planning to build more than 30 large and medium-sized water conservancy and hydropower projects. Over the years, the compensation and resettlement for land requisition in the construction of water resources and hydropower projects in Jilin Province have been properly handled. The resettlers of reservoirs have moved out of the reservoir area on schedule and are properly resettled. The construction of water conservancy and hydropower projects is smooth and the society in the reservoir area and resettlement area is overall harmonious and stable.