论文部分内容阅读
一个工程项目在施工之前,施工人员必须对施工的各项活动做出全面的部署,把设计和施工、技术和经济、前方和后方、企业的全局活动和工程的施工组织以及施工中各单位、各阶段、各项目之间的关系等更好地组织起来,使施士建立在科学合理的基础上,从而做到人尽其力、物尽其用,优质、低耗、高速地取得最好的经济效益和社会效益。这是对施工组织设计编制的本质要求。
Before the construction of a project, the constructors must make a comprehensive deployment of various activities in the construction. The design and construction, technology and economy, the front and rear, the overall activities of the enterprise and the construction and organization of the project as well as the construction units, The various stages, the relationship between the various projects, and so on to better organize so that the establishment of Sze on a scientific and rational basis, so as to do its utmost, make the best use, high quality, low consumption, high speed to obtain the best The economic and social benefits. This is the essential requirement for the design of construction organization.