论文部分内容阅读
随着当前我国建筑行业的快速发展,建筑工程的发展形式也变得越来越多样化,不同的建筑形式其工程成本也将有所不同,尤其是以装配式建筑工程与现浇建筑工程为例,其成本费用之间究竟存在多大的差异,目前鲜有准确的答案。对此,本文将对电气工程、土建工程、采暖工程、装饰工程以及给排水工程在装配式与现浇式两种建筑工程形式中的经济成本展开对比分析,并对装配式建筑工程成本相对较高的原因进行了深入剖析。
With the rapid development of China’s construction industry, the development forms of construction engineering have also become more and more diversified, and the cost of different types of construction projects will also be different. In particular, the cost of assembly-type construction and cast-in-place construction is For example, how much is the difference between the cost and the cost? There are few accurate answers at present. In this regard, this article will be electrical engineering, civil engineering, heating engineering, decoration engineering and water supply and drainage engineering in the form of two kinds of assembly and on-site economic costs in the comparative analysis, and assembly-type construction cost is relatively High reason for in-depth analysis.