论文部分内容阅读
2011年6月11日,东方电机有限公司设计制造的四川官地水电站首台机组水轮机转轮交接仪式在建设工地现场举行,这标志着雅砻江干流上的官地水电站进入发电“倒计时”。官地水电站位于四川凉山州西昌市与盐源县交界的雅砻江干流上,上游有在建的锦屏一级水电站和锦屏二级水电站,下游有已建成的二滩水电站。官地电站装机4×600MW机组,东方电机设计制造的官地水电站水轮机转轮最大直径7.85m,最大高度4.1m,总重量252t。官地水电站首台机组计划2012年投产发电,2013年工程竣工。
June 11, 2011, Dongfang Electric Co., Ltd. designed and manufactured in Sichuan Guan Di hydropower station first turbine wheel handover ceremony held at the construction site, which marks the mainstream of the Yalong River on the official power station into the power generation “Countdown ”. Guandi Hydropower Station is located in the mainstream of the Yalong River at the junction of Xichang City and Yanyuan County in Liangshan Prefecture, Sichuan Province. There are Jinping I and Jinping II hydropower stations in the upper reaches and Ertan Hydropower Station in the downstream. Guandi Power Station installed 4 × 600MW units, designed and manufactured by Dongfang Hydropower Station Guandi turbine runner maximum diameter of 7.85m, the maximum height of 4.1m, the total weight of 252t. The first unit of Guandi Hydropower Station is scheduled to start generating electricity in 2012 and completed in 2013.