论文部分内容阅读
中国大陆科学钻探工程——科钻1井位于江苏东海县境内,所钻遇地层为超高压结晶变质岩,岩层变化异常频繁,岩石硬度高、密度大,地层倾角在70°以上。在这样的地层中钻进,世界上也是首次。在钻井施工中,在国内首次采用螺杆马达驱动PDC钻头连续取心钻进,大大提高了钻进速度和岩心收获率,并创出2000m先导孔和主孔二孔合一的奇迹。目前该井已顺利完成主孔3000m取心钻进,在3011.45~3020.14m井段获得Φ95.7mm、长3.02m的完整岩心,这是该井开钻以来获得的最长完整岩心,也是世界上在这一层段至今获得的最长完整岩心。
China Continental Scientific Drilling Project - Branch Drilling 1 is located in Donghai County, Jiangsu Province, the drilling of the formation of UHPM crystalline metamorphic rocks, abnormal changes in the rock, rock hardness, density, stratum dip above 70 °. For the first time in the world, drilling in such formations. In drilling construction, the first use of screw motor in China to drive PDC bit continuous coring drilling, greatly improving the drilling speed and core yield, and create a pilot hole and the main hole 2000m miracle of two holes. At present, the well has successfully completed the core drilling of 3000m with a complete core of Φ95.7mm and length of 3.02m obtained in the well 3011.45 ~ 3020.14m, which is the longest complete core obtained since the well was drilled, The longest complete core ever obtained in this interval.