摘要:随着我国社会的不断发展,人民生活水平的提高,我国各个行业的科学技术水平也得到了相应的提高,在我国的城市化发展的进程中不断的加快城市中,市政建设也越来越趋于高质量化。给排水管线的施工对于一个城市的发展建设和居民的稳定生活具有重要的意义,它不仅是城市战略基础配备,还与其他城市基础设施有着千丝万缕的关系。本文根据市政给水排水管线的实际施工对施工过程中的重要环节进行具体阐述分析。
关键词:给排水;管线;施工
Abstract: with the continuous development of our society, the improvement of people's living standards, the scientific and technological level of industries in our country also got the corresponding increase, in the process of urbanization in our country unceasingly speeds up the city, municipal construction is becoming more and more tend to be high quality. Water supply and drainage pipeline construction for the development of a city construction and people's stable life is of great importance, it is not only a strategic foundation with city, is also associated with other urban infrastructure. According to the actual construction of municipal water supply and drainage pipeline concrete in this paper, the analysis of an important link of the construction process.
Keywords: water supply and drainage; Pipeline; The construction
中图分类号:TL353+.2文献标识码:A文章编号:2095-2104(2013)
引言
城市建设速度的不断加快,对市政工程质量也提出了更高的要求。市政给排水工程的质量,对于居民的身体健康以及城市的工业生产等都有着重要的影响,供排水管的重要性是显而易见的,可以说,该管线的施工质量的好坏不仅影响城市的发展,还对于城市的环保,道路的完好都有极大的影响,如果没有质量可靠,疏通性优良的給排水管线系统,可能会给城市带来毁灭性的灾难。为了保证给排水管线的质量,当前使用的较为普遍的是硬聚氯乙烯冷热给水管,与普通的金属管材相比,其具有更高的流速和更小的阻力,而且管线的自重较轻,施工也较为容易,因此受到了广泛的应用。
市政给排水管线施工工艺的概述
给排水管道的预制和切割
管道预制的作业过程为两方面:一方面是对管道预制只能选用大于2"的管,所有设备都要在施工当场进行预制,除了撬装设备之外。另一方面是在进行下料的时候,需要对其所用的管件等物件进行严格的检查,并对其出现的损坏的进行及时的更换,对已经出现问题对其进行标记,以保证施工中所用的管道用品是好的,只有这样才能保证其不发生漏水现象,并严格的管理好已经进行标记了的材料,以防止以后在施工中被使用。
管材切割的作业中也分为两方面进行注意:一方面是在进行机械火焊对其进行分割的时候,可以在小于2"的钢管道的时候对其使用切割机,值得注意的是在进行不锈钢的管道切割时,不能够使用火焊对其进行分割。在大于 2" 的不锈钢管使用等离子进行切割,这样就需要用到等离子切割机,在切割后要严格的防止其表面被氧化物和残渣包着。
给排水管的安装
考虑到站场场地,地管管沟采用人工开挖,开挖之前应按图纸放线,挖出的土方尽量堆放到一边,沟挖完后,应检查管底标高及坐标,管底应夯实。地管下沟时注意不要损坏防腐层,管两端应封闭,防止杂物进入管内。
管道安装前,应用压缩空气清理管道及管件,同时作好记录。管子对口时检查平直度,管道连接不得强力对口、加热管子等方法来消除接口端面的空隙、偏差等缺陷。不锈钢管道安装时,不得使用铁质工具敲击。与容器、设备和泵互连接的法兰,安装时采用临时石棉盲板,与动设备连接的管道,其固定焊口远离设备,管道安装合格后,动设备不得承受设计外的附加载荷。
管道安装要遵循以下原则:
(1)在施工过程中遇到土建相关的施工要进行专向监测,所有数据表明可以继续下一环节施工。
(2)管道的各类相关设施已经安装结束。
(3)给水排水管道的初步安装已经到位,各类零件没有漏装少装,各项的检验也已经完成,检验数据合格。
给排水管的压力测试
对管线的压力实验时要预先对不需要进行试压的管线部分进行封闭或隔离处理,一般有部分系统、仪表、设备等,在这些附加了盲板的管线组成上不能发生标志不明晰的现象。
正式进行施压时要再一次对管线进行检验,开合阀门确定管线中介质的流动方向,一旦发现方向相反,就要对其进行阀芯取出的操作,处理后重新安装。
试压步骤:
(1) 水压试验系统充水时尽量从管道底部充入,在管道系统最高点将系统内部的空气排尽,最高点必须装压力表。
(2)缓慢升压,达到试验压力后,停压 10 分钟,如无压降、目测管道无变形,然后压力降至设计压力,对管道系统全面检查,如果发现泄漏,应该泄压处理,不得带压操作。
(3)气压试验,压力应逐渐缓升,首先升至试验压力的 50%,检查所有焊缝、阀门、法兰口,无泄漏无异常现象,继续按试验压力的10%逐渐升压,直至实验压力,每一级稳压 3 分钟,达到试验后稳压 5 分钟,如无压降、目测无形,然后压力降至设计压力,用涂肥皂水方法检查焊缝、阀门、法兰口(如无泄漏)稳压 30 分钟,压力仍不降为合格。如果发一泄漏,应该压处理,不得带压处理。
市政给排水管线的施工方案
在设计管道线施工方案时,要采用考虑齐全的科学方法。这样设计出来的线路才能达到有效排水。在设计的时候,要考虑当地的自然条件和规划、环保、卫生等部门的要求,根据原有设施做参考,合理全面的进行综合考虑设计。
(一)提前做好地质情况勘察
从很多实际情况看出来,有很多设计者在设计的时候,根本就在纸上谈兵,未实地对当地的水文地质以及工程地质进行勘察。这样就会造成施工麻烦,比如出现流砂,淤泥和涌水等现象。导致一些特殊的地段管道需要接口特殊处理、基础需要加固等现象。有的时候缺乏处理技术,或者需要赶工期,一些施工单位就检查的处理,根部不能保证施工的质量,为以后的管线网使用带来了遗留问题。因此,在设计的时候,设计者必须实地进行勘察,避免一系列的施工问题产生。如果确实不能避免,也应该标注清楚,施工员会针对性的做出处理方案。
(二)要弄清楚地下的设施埋设情况
现在埋在地下的管线太多了,什么电力电缆线,什么煤气管道等,弄的整个地下就像一张复杂的网,错纵横交错。因此,在设计施工方案的时候,必须要提前摸清施工路线下面是否有这些网络。如果不摸清地下清楚,而导致在施工过程中破坏了别人的管线,那就带来了不必要的麻烦。一旦在施工工程中遇到麻烦,那么管道的走向、高度以及坡度就很难重新调整了。可如果不调整,又会出现倒水的现象,造成管道堵塞,会带来更大的后期麻烦。因此,在设计方案的时候,必须要弄清新建管线的沿途的地下埋设情况,还要弄的一清二楚,设计出合理、科学的管线路由。
(三)维护部门参与
在管线施工完成,投入使用之后,一切的后继工作就归入到维护部门。他们里面的工作人员对后期容易出现的问题,以及使用过程中引发出来的问题都是了如指掌。那么,在设计的时候,要多听取他们的意见,根据他们提出的预防性问题做出相应的修改,才能设计出完美的施工方案。
(四)对材料的选择
在傳统的供排水管线中,基本都采用混凝土管或球墨铸铁管,虽然价格相对低廉,但是水管的体积和重量都比较大,为整个施工带来极大的难度,加之传统管材易碎且不耐腐蚀,导致使用寿命较短,过不了多久又需要更换新管。
结束语
市政工程给排水管线的建设,关系到一个城市的发展和居民生活的稳定,而管线工程建设的施工工艺,又决定着这个城市的建设水平和发展后劲,因此,给排水施工技术人员,应当充分重视给排水管线的施工工艺, 保证市政给水管线的高质量布线。以上谈到的几点,就是市政给水排水管线施工的重要环节,虽然不是管线施工的全部环节,但是掌握住这些环节的施工质量,就能将管线的施工质量做到最大程度上的保证,而且,上文提及的这些环节也是管线施工中最容易出现问题的施工步骤,所以经过本文的论述后,能得到同行在施工过程中的重视,以及为同行的工作起到帮助作用。
参考文献:
[1] 郭凯.市政工程中给排水管线施工工艺浅析[J].城市建筑,2012(12).
[2] 姜岩,姜海龙.市政工程给排水管线施工工艺研究[J].科技致富向导,2011(8).
[3] 唐宁霞,陶义.市政工程给排水管线施工工艺分析[J].科技咨询,2009.
[4] 王景禄,蒋玉水,庞继高,陈光照. 市政给排水管线施工工艺探讨[J].黑龙江科技信息,2012(11).
[5] 赵满,王运铎. 市政给排水管线的施工工艺[J].科技创新与应用,2012(9).
关键词:给排水;管线;施工
Abstract: with the continuous development of our society, the improvement of people's living standards, the scientific and technological level of industries in our country also got the corresponding increase, in the process of urbanization in our country unceasingly speeds up the city, municipal construction is becoming more and more tend to be high quality. Water supply and drainage pipeline construction for the development of a city construction and people's stable life is of great importance, it is not only a strategic foundation with city, is also associated with other urban infrastructure. According to the actual construction of municipal water supply and drainage pipeline concrete in this paper, the analysis of an important link of the construction process.
Keywords: water supply and drainage; Pipeline; The construction
中图分类号:TL353+.2文献标识码:A文章编号:2095-2104(2013)
引言
城市建设速度的不断加快,对市政工程质量也提出了更高的要求。市政给排水工程的质量,对于居民的身体健康以及城市的工业生产等都有着重要的影响,供排水管的重要性是显而易见的,可以说,该管线的施工质量的好坏不仅影响城市的发展,还对于城市的环保,道路的完好都有极大的影响,如果没有质量可靠,疏通性优良的給排水管线系统,可能会给城市带来毁灭性的灾难。为了保证给排水管线的质量,当前使用的较为普遍的是硬聚氯乙烯冷热给水管,与普通的金属管材相比,其具有更高的流速和更小的阻力,而且管线的自重较轻,施工也较为容易,因此受到了广泛的应用。
市政给排水管线施工工艺的概述
给排水管道的预制和切割
管道预制的作业过程为两方面:一方面是对管道预制只能选用大于2"的管,所有设备都要在施工当场进行预制,除了撬装设备之外。另一方面是在进行下料的时候,需要对其所用的管件等物件进行严格的检查,并对其出现的损坏的进行及时的更换,对已经出现问题对其进行标记,以保证施工中所用的管道用品是好的,只有这样才能保证其不发生漏水现象,并严格的管理好已经进行标记了的材料,以防止以后在施工中被使用。
管材切割的作业中也分为两方面进行注意:一方面是在进行机械火焊对其进行分割的时候,可以在小于2"的钢管道的时候对其使用切割机,值得注意的是在进行不锈钢的管道切割时,不能够使用火焊对其进行分割。在大于 2" 的不锈钢管使用等离子进行切割,这样就需要用到等离子切割机,在切割后要严格的防止其表面被氧化物和残渣包着。
给排水管的安装
考虑到站场场地,地管管沟采用人工开挖,开挖之前应按图纸放线,挖出的土方尽量堆放到一边,沟挖完后,应检查管底标高及坐标,管底应夯实。地管下沟时注意不要损坏防腐层,管两端应封闭,防止杂物进入管内。
管道安装前,应用压缩空气清理管道及管件,同时作好记录。管子对口时检查平直度,管道连接不得强力对口、加热管子等方法来消除接口端面的空隙、偏差等缺陷。不锈钢管道安装时,不得使用铁质工具敲击。与容器、设备和泵互连接的法兰,安装时采用临时石棉盲板,与动设备连接的管道,其固定焊口远离设备,管道安装合格后,动设备不得承受设计外的附加载荷。
管道安装要遵循以下原则:
(1)在施工过程中遇到土建相关的施工要进行专向监测,所有数据表明可以继续下一环节施工。
(2)管道的各类相关设施已经安装结束。
(3)给水排水管道的初步安装已经到位,各类零件没有漏装少装,各项的检验也已经完成,检验数据合格。
给排水管的压力测试
对管线的压力实验时要预先对不需要进行试压的管线部分进行封闭或隔离处理,一般有部分系统、仪表、设备等,在这些附加了盲板的管线组成上不能发生标志不明晰的现象。
正式进行施压时要再一次对管线进行检验,开合阀门确定管线中介质的流动方向,一旦发现方向相反,就要对其进行阀芯取出的操作,处理后重新安装。
试压步骤:
(1) 水压试验系统充水时尽量从管道底部充入,在管道系统最高点将系统内部的空气排尽,最高点必须装压力表。
(2)缓慢升压,达到试验压力后,停压 10 分钟,如无压降、目测管道无变形,然后压力降至设计压力,对管道系统全面检查,如果发现泄漏,应该泄压处理,不得带压操作。
(3)气压试验,压力应逐渐缓升,首先升至试验压力的 50%,检查所有焊缝、阀门、法兰口,无泄漏无异常现象,继续按试验压力的10%逐渐升压,直至实验压力,每一级稳压 3 分钟,达到试验后稳压 5 分钟,如无压降、目测无形,然后压力降至设计压力,用涂肥皂水方法检查焊缝、阀门、法兰口(如无泄漏)稳压 30 分钟,压力仍不降为合格。如果发一泄漏,应该压处理,不得带压处理。
市政给排水管线的施工方案
在设计管道线施工方案时,要采用考虑齐全的科学方法。这样设计出来的线路才能达到有效排水。在设计的时候,要考虑当地的自然条件和规划、环保、卫生等部门的要求,根据原有设施做参考,合理全面的进行综合考虑设计。
(一)提前做好地质情况勘察
从很多实际情况看出来,有很多设计者在设计的时候,根本就在纸上谈兵,未实地对当地的水文地质以及工程地质进行勘察。这样就会造成施工麻烦,比如出现流砂,淤泥和涌水等现象。导致一些特殊的地段管道需要接口特殊处理、基础需要加固等现象。有的时候缺乏处理技术,或者需要赶工期,一些施工单位就检查的处理,根部不能保证施工的质量,为以后的管线网使用带来了遗留问题。因此,在设计的时候,设计者必须实地进行勘察,避免一系列的施工问题产生。如果确实不能避免,也应该标注清楚,施工员会针对性的做出处理方案。
(二)要弄清楚地下的设施埋设情况
现在埋在地下的管线太多了,什么电力电缆线,什么煤气管道等,弄的整个地下就像一张复杂的网,错纵横交错。因此,在设计施工方案的时候,必须要提前摸清施工路线下面是否有这些网络。如果不摸清地下清楚,而导致在施工过程中破坏了别人的管线,那就带来了不必要的麻烦。一旦在施工工程中遇到麻烦,那么管道的走向、高度以及坡度就很难重新调整了。可如果不调整,又会出现倒水的现象,造成管道堵塞,会带来更大的后期麻烦。因此,在设计方案的时候,必须要弄清新建管线的沿途的地下埋设情况,还要弄的一清二楚,设计出合理、科学的管线路由。
(三)维护部门参与
在管线施工完成,投入使用之后,一切的后继工作就归入到维护部门。他们里面的工作人员对后期容易出现的问题,以及使用过程中引发出来的问题都是了如指掌。那么,在设计的时候,要多听取他们的意见,根据他们提出的预防性问题做出相应的修改,才能设计出完美的施工方案。
(四)对材料的选择
在傳统的供排水管线中,基本都采用混凝土管或球墨铸铁管,虽然价格相对低廉,但是水管的体积和重量都比较大,为整个施工带来极大的难度,加之传统管材易碎且不耐腐蚀,导致使用寿命较短,过不了多久又需要更换新管。
结束语
市政工程给排水管线的建设,关系到一个城市的发展和居民生活的稳定,而管线工程建设的施工工艺,又决定着这个城市的建设水平和发展后劲,因此,给排水施工技术人员,应当充分重视给排水管线的施工工艺, 保证市政给水管线的高质量布线。以上谈到的几点,就是市政给水排水管线施工的重要环节,虽然不是管线施工的全部环节,但是掌握住这些环节的施工质量,就能将管线的施工质量做到最大程度上的保证,而且,上文提及的这些环节也是管线施工中最容易出现问题的施工步骤,所以经过本文的论述后,能得到同行在施工过程中的重视,以及为同行的工作起到帮助作用。
参考文献:
[1] 郭凯.市政工程中给排水管线施工工艺浅析[J].城市建筑,2012(12).
[2] 姜岩,姜海龙.市政工程给排水管线施工工艺研究[J].科技致富向导,2011(8).
[3] 唐宁霞,陶义.市政工程给排水管线施工工艺分析[J].科技咨询,2009.
[4] 王景禄,蒋玉水,庞继高,陈光照. 市政给排水管线施工工艺探讨[J].黑龙江科技信息,2012(11).
[5] 赵满,王运铎. 市政给排水管线的施工工艺[J].科技创新与应用,2012(9).