阿伦布雷拉矿的设计始于1995年6月。精矿生产始于1997年第三季度的初期。该矿自位于阿根廷西北部。阿伦布雷拉选厂目前正由阿伦布雷拉矿物公司进行开发.阿伦布雷拉矿是阿根廷第一个现代化的铜矿。本文概述了阿伦布雷拉选厂设计中采用的主要工艺和选厂配置的特点。另外,它还介绍对造厂工艺流程和设备选择的情况。该工艺流程的一个特点是在粗磨和再磨回路以及铜精矿生产回路中都有重力选金作业。
The design of the Arun Brera mine started in June 1995. Concentrate production began in the early third quarter of 1997. The mine is located in northwestern Argentina. The Arum Brela mill is currently being developed by Arum Brera Minerals. The Arun Brera mine is Argentina’s first modern copper mine. This article outlines the features of the main process and plant configuration used in the design of the Arun Brera mill. In addition, it also introduces the process of manufacturing plant and equipment selection. One of the features of this process is the gravity-gated operation in the rough and regrind circuits and the copper concentrate production circuit.