莱城发电厂是华电国际公司的全资企业,隶属中国华电集团公司,一期工程装机容量为4×300MW燃煤火电机组,于1998年3月开工建设,2003年5月全部建成投产。工程总投资48.22亿元,创出全省同期同类型机组造价最低水平。相继投产的四台机组创造了多项全国纪录,实现了“一台比一台好”的投产目标。首台机组创造了试生产期连续运行123天的全国同类型及以上机组最高纪录。第二台机组创出11天完成整套试运及试生产期连续运行131天的“大世界基尼斯纪录”。3、4号机组主体工程荣获2004年度“中国建筑工程鲁班奖”。
Laicheng Power Plant is a wholly-owned subsidiary of Huadian Power International Corporation, a subsidiary of China Huadian Corporation. The first phase of the project has an installed capacity of 4 × 300MW coal-fired thermal power units. Construction started in March 1998 and all of them were put into operation in May 2003. The total investment of 48.22 billion yuan project, creating the province over the same period with the lowest cost of the same type of unit. Four units have been put into operation to create a number of national records, to achieve “a Taiwan is a good ” production target. The first unit created a trial run of 123 days of continuous operation of the same type and above the highest unit record. The second unit hit 11 days to complete the entire trial run and trial production period of 131 days of continuous operation “World Guinness Book of Records ”. Unit 3 and Unit 4 won the 2004 “China Construction Luban Award”.