在老厂改造工程中,对深坑基础的设计方案,往往会受到密集建筑群内相邻建(构)筑物的限制,在不能采用放坡大开挖施工,且在没有条件采用连续墙施工时,常需采用开口沉井的设计方案。但在设计和施工中应充分考虑确保施工安全的措施,特别是在上海的饱和软土地基上施工,设计中必须处理好开口沉井自重在下述三个施工阶段的关系: 1.沉井下沉阶段,要求沉井克服侧壁摩阻力,此时,希望沉井自重重些; 2.沉井刃脚到达设计标高,要求沉井稳定不再下沉时,希望沉井自重要轻些;
In the old factory renovation project, the design scheme for the deep pit foundation is often restricted by the adjacent buildings (structures) within the densely-packed buildings. The construction cannot be carried out by grading and excavation, and there is no condition for the use of continuous walls. During construction, open caisson designs are often required. However, measures to ensure the safety of construction should be fully considered in design and construction, especially on the saturated soft soil foundation in Shanghai. The design must deal with the relationship between the open caisson self-weight in the following three construction phases: At this stage, it is required that the caisson overcome the frictional resistance of the sidewalls. At this time, it is hoped that the caisson will be heavy; 2. When the caisson of the caisson arrives at the design elevation, and the stability of the caisson no longer needs to sink, it is hoped that the caisson will be lighter;