论文部分内容阅读
【摘 要】本文通过园林绿化树种的移栽概述,根据设计规定的树种、规格及特定要求进行选树。以浅根性和再生能力强且易于移栽成活的树种为佳。除从树木本身各方面如生长健壮、无病虫害、树冠丰满、有新生枝条等加以选择外,还应选择便于挖掘、吊装及运输的树木。
【关键词】 园林绿化 大树移栽 成活 技术 探讨
Gardening trees transplant survival and management technology measures
Liuxiaoping
【Abstract】Overview of transplant through greening tree species in this article, based on the design requirements of selected tree species, specification and specific requirements. In light of the root and regeneration ability and easy to transplant survival of species are preferred. Except from areas such as growth of the tree itself plump, robust, free of pests and diseases, canopy new branches, and so choices, should also be selected for mining, hoisting and transport trees.
【Keywords】Landscape Greening, Transplanting trees ,survive , technology , investigation
随着现代城市园林绿化建设的不断深入,新建的园林绿地与重点街道的增多,人们对环境绿化的要求标准越来越高,单纯用小苗栽植来绿化现代化城市,已不能满足目前城市环境绿化建设的需要,特别是重点环境绿化工程,往往是突出高标准、高质量的绿化机能,又能在短时间内,体现出效果。因而园林绿化大树栽植成为园林绿化建设的一项重要工程。随着城市化的高速发展,生态环境的日益恶化,“回归自然,返璞归真”越来越成为人们普遍的心愿。因此,探讨园林绿化大树移栽技术及管理措施,对现代园林绿化建设有着深刻的意义。
现根据多年工作实践经验,浅谈园林绿化大树移栽成活技术措施。
一、影响园林绿化大树移栽成活的因素[1]
1.土壤
大树移栽后因土壤PH值、通透状况、肥力条件等差异而形成不适应期,甚至排斥性,导致树体枯萎死亡。
2.水分
移栽大树前,水分的循环呈良性,叶表蒸腾量一般占根系吸收量99%左右,地上、地下的水分处于平衡状态。而移栽后,水分平衡被迅速打破,大树终因水分消耗与供给严重失调日现枯萎死亡。
3.温度
物种在长期的进化过程中,形成了各自所适应的生长带区域。远距离、迁徙式的移栽,改变了树木生长在原始自然条件而导致枯萎死亡,此外,特殊年份的强烈季节温差也会导致移栽大树的死亡。
4.光照
不同树种对光照的要求不同,超负荷的光照强度变化,是导致移栽大树死亡的原因之一。
5.其他
大风及其他外力,折断枝叶、拔断根系、污染的环境如有毒有害气体会使树木中毒;病虫害以及移栽技术等原因也会导致树木死亡。
二、园林绿化大树移栽技术措施[4]
1.移栽前的准备与处理
1.1选树
首先根据设计规定的树种、规格及特定要求如树形、姿态、花色等进行选树。一般是选能适应当地自然环境条件的乡土树种,以浅根性和再生能力强且易于移栽成活的树种为佳。除从树木本身各方面如生长健壮、无病虫害、树冠丰满、有新生枝条等加以选择外,还应选择便于挖掘、吊装及运输的树木。
1.2栽植穴的准备
移栽前挖好树穴。树穴要排水良好,坑内表土、底土分放。如土质不好应采取相应的消毒、施肥或换种植土等措施,换土一定要将虚土夯实,并提前灌水下沉。树穴的大小应根据苗木根系、土球直径和土壤情况有所不同,一般应比土球的直径大30~40cm,比土球的高度深15cm。
1.3平衡修剪
园林绿化树种成活的关键是地下部分和地上部分的能量的平衡,因此大树移栽前需进行树冠修剪。
1.4 缚枝与裹干
为了便于运输,运输前还要对树身进行缚枝。分枝较矮、树冠松散的树木,用绳索围拢拉紧树冠。从基部开始分枝的树木,将草绳一端扎缚于盘干基部,草绳按自下而上的方法将树身围拢扎紧;容易折断的树木,将枝干与树干间用木棍等固定,形成相互支撑,可防止枝干折断。
2.移栽前进行新根培育和树冠修剪
2.1根
采取断老根的办法。在大树移植前1~2年春季或秋季在树盘四周挖一圈深沟,直径相当于树根基部直径的5~6倍,深度视主根、侧根群的分布深度而定,一般为80~100cm。碰到根系一律剪断,沟挖好后,填入肥沃土,定期浇水。沟内土下沉后加土填满。经过1~2年精心管理,根部切口处就能长出新根。
2.2枝 在移栽前的半个月左右,先修去树冠的三分之一,到移栽时再修去适当部分枝条。修剪留下的伤口[2]及时进行防腐处理,用蜡封伤口,再用薄膜将伤口包严扎紧。
3.园林绿化大树移栽技术措施[4]
3.1定植
原则上朝向最好同树木原植地朝向一致时先在树穴底部垫入10~20cm厚腐熟的农家肥与土壤的混合肥(比例为1:1),土球上喷洒保水剂;方向确定后,向坑内回填少量土并塌实,保证树干与地面垂直稳定,用木棒或者铁丝支撑树体,然后剪开包装材料,将不宜腐烂的材料取出。树木栽植的深浅也有所不同,主根侧根发达,须根不多的树,土球2/3入地,1/3露在地面,然后培土成丘;主根不发达,侧根须根较多的树宜平地栽植,为防止浇水后土塌树斜,填土应分层塌实,每20~30cm塌实一次,并尽量采用原土种植。
3.2栽植坑
栽植坑大小视移栽大树的土球大小而定。一般胸径8-10cm的落叶乔木,挖直径100cm、深70cm的树坑,大树可再挖深些、宽些。每坑施腐熟有机肥20~25kg,填入30cm厚的客土后栽植。栽前先测定树坑的深浅宽窄。稍作修整后放入土球,要求土球高出地面5cm左右。一人扶正树干,另一人剪除土球上的包装物,先填表土、后填心土,边填土边踏实,做到“一埋二栽三提“然后浇透水,水渗后最后用土在树干基部培成馒头状,搭支架固定,防止树木摇晃。
三、园林绿化树木抚育管理[3]
常言说:“三分造七分管”。包括保湿、固定、施肥、遮阴、松土、除草、加土、扶正、修剪、留芽、病虫害防治等工作。4~6月份,气温逐渐升高树木生长旺盛,需要经常浇水。以浇透、土面潮湿而不积水为度。7~8月份雨季注意排水。施肥结合松土浇水进行。用充分腐熟的有机肥,如人畜粪尿等加水稀释后施用。施肥要求稍离根部,可以沿原栽植穴外围施肥,施肥后覆土保墒。经过多次浇水和下雨土壤板结,透气性差,要及时松土。一般每月松土、除草一次,松土深度为5~8cm,新栽植的大树,下雨后全面检查一次,树干动摇的加土踩实,根部下沉凹陷的覆土填平,歪斜的扶正加固。
1.固定
高大的乔木栽植后应随即以支柱支撑加固。一般立三根,以支点不低于树高2/5,支柱与地面夹角不大于600为佳。
2.保湿
晴天隔7~10天后浇第2次水,隔15~18天后浇第3次水,以后浇水间隔期可适当拉长,期间根部可以灌一至两次生根剂,常绿树可结合树冠喷水、喷雾加以保湿,以不淋湿表层土壤为度,如连日降雨不停,应地表遮雨,以防长时间积水浸泡,造成根系腐烂。浇水后出现土壤沉陷,致使树木倾斜时应扶正、培土,及时封好树穴。
3.遮阴
如是喜荫树种,栽植后若阳光过强,应搭架拉遮阳网,以防止日光灼伤和水分散失。
4.施肥
移栽的树木在第一年不需要施化肥,翌年的秋季进行秋季施肥,高大落叶乔木距树干地径30cm处环穴12cm深施500ɡ磷酸二氨,将其穴沟表土填平。
5.修剪
虽然在移栽前做过修在,栽植后仍需及时检查和修剪整理,在运输和栽植过程中折断和受伤的枝条应全部剪掉。在不影响树型美观和树冠基本完整的基础上,对枝叶进行适当的疏剪、短截、回缩。具体修剪量视树木再生能力而定,一般可达30~50%。
6.松土(培土)第一水浇过6天后,进行二次培土,各地的时间有差异,一般根据树坑浇水后土壤裂缝而定时间;浇二水后观察土壤泛白进行松土,松土深度5-8㎝。
7.除草
一般情况下新移栽的树木杂草甚微,翌年的秋季进行除草。
8.留芽
必须尽量提高芽位,在枝干较高部位留芽,芽位高则水势强,水分养分向高处运输,带动全株生长。
9.病虫害防治
新移栽树木的抗病能力差,所以应根据当地病虫害发生情况随时观察,适时采取预防措施。
10.越冬管理
保证足够的越冬水,到大雪节灌透第一水,过一月后进行灌第二水。
四、讨论
城市园林绿化树木的栽植养护因树种、环境、季节的实际情况不同而有所差异,需要在实践中加以分析掌握,因时因地因树灵活的加以应用才能收到预期的效果。树木成活与否不能从一个生长年得出结论,而需要2~3个生长年的逐步适应才能完全成活,才能安全度过危险期,因此必须加强维护,以防前功尽弃。值得注意的是,大树移栽虽然有利于改善城市的生态环境,但也要考虑其技术难度和经济投入,要因地制宜,不能盲目效仿,更不能随意破坏自然资源。
参考文献:
[1]蔡玉新、陈忠、万旭东、陈金萍,影响大树移植成活的原因及对策,贵州农业科学,2001,29(6).
[2]陈有民,园林树木学,北京:中国林业出版社,2001.
[3]胡万银,大树的移植技术及养护管理,山西林业科技,2002,3(1).
[4]蒋向中,大树移栽技术,教育与研究,1997,(1).
[5]萧鸣,美化家园,北京:中国环境科学出版社,1999.
[6]王晓华,浅谈大树移栽技术,内蒙古林业,2000、8.
【关键词】 园林绿化 大树移栽 成活 技术 探讨
Gardening trees transplant survival and management technology measures
Liuxiaoping
【Abstract】Overview of transplant through greening tree species in this article, based on the design requirements of selected tree species, specification and specific requirements. In light of the root and regeneration ability and easy to transplant survival of species are preferred. Except from areas such as growth of the tree itself plump, robust, free of pests and diseases, canopy new branches, and so choices, should also be selected for mining, hoisting and transport trees.
【Keywords】Landscape Greening, Transplanting trees ,survive , technology , investigation
随着现代城市园林绿化建设的不断深入,新建的园林绿地与重点街道的增多,人们对环境绿化的要求标准越来越高,单纯用小苗栽植来绿化现代化城市,已不能满足目前城市环境绿化建设的需要,特别是重点环境绿化工程,往往是突出高标准、高质量的绿化机能,又能在短时间内,体现出效果。因而园林绿化大树栽植成为园林绿化建设的一项重要工程。随着城市化的高速发展,生态环境的日益恶化,“回归自然,返璞归真”越来越成为人们普遍的心愿。因此,探讨园林绿化大树移栽技术及管理措施,对现代园林绿化建设有着深刻的意义。
现根据多年工作实践经验,浅谈园林绿化大树移栽成活技术措施。
一、影响园林绿化大树移栽成活的因素[1]
1.土壤
大树移栽后因土壤PH值、通透状况、肥力条件等差异而形成不适应期,甚至排斥性,导致树体枯萎死亡。
2.水分
移栽大树前,水分的循环呈良性,叶表蒸腾量一般占根系吸收量99%左右,地上、地下的水分处于平衡状态。而移栽后,水分平衡被迅速打破,大树终因水分消耗与供给严重失调日现枯萎死亡。
3.温度
物种在长期的进化过程中,形成了各自所适应的生长带区域。远距离、迁徙式的移栽,改变了树木生长在原始自然条件而导致枯萎死亡,此外,特殊年份的强烈季节温差也会导致移栽大树的死亡。
4.光照
不同树种对光照的要求不同,超负荷的光照强度变化,是导致移栽大树死亡的原因之一。
5.其他
大风及其他外力,折断枝叶、拔断根系、污染的环境如有毒有害气体会使树木中毒;病虫害以及移栽技术等原因也会导致树木死亡。
二、园林绿化大树移栽技术措施[4]
1.移栽前的准备与处理
1.1选树
首先根据设计规定的树种、规格及特定要求如树形、姿态、花色等进行选树。一般是选能适应当地自然环境条件的乡土树种,以浅根性和再生能力强且易于移栽成活的树种为佳。除从树木本身各方面如生长健壮、无病虫害、树冠丰满、有新生枝条等加以选择外,还应选择便于挖掘、吊装及运输的树木。
1.2栽植穴的准备
移栽前挖好树穴。树穴要排水良好,坑内表土、底土分放。如土质不好应采取相应的消毒、施肥或换种植土等措施,换土一定要将虚土夯实,并提前灌水下沉。树穴的大小应根据苗木根系、土球直径和土壤情况有所不同,一般应比土球的直径大30~40cm,比土球的高度深15cm。
1.3平衡修剪
园林绿化树种成活的关键是地下部分和地上部分的能量的平衡,因此大树移栽前需进行树冠修剪。
1.4 缚枝与裹干
为了便于运输,运输前还要对树身进行缚枝。分枝较矮、树冠松散的树木,用绳索围拢拉紧树冠。从基部开始分枝的树木,将草绳一端扎缚于盘干基部,草绳按自下而上的方法将树身围拢扎紧;容易折断的树木,将枝干与树干间用木棍等固定,形成相互支撑,可防止枝干折断。
2.移栽前进行新根培育和树冠修剪
2.1根
采取断老根的办法。在大树移植前1~2年春季或秋季在树盘四周挖一圈深沟,直径相当于树根基部直径的5~6倍,深度视主根、侧根群的分布深度而定,一般为80~100cm。碰到根系一律剪断,沟挖好后,填入肥沃土,定期浇水。沟内土下沉后加土填满。经过1~2年精心管理,根部切口处就能长出新根。
2.2枝 在移栽前的半个月左右,先修去树冠的三分之一,到移栽时再修去适当部分枝条。修剪留下的伤口[2]及时进行防腐处理,用蜡封伤口,再用薄膜将伤口包严扎紧。
3.园林绿化大树移栽技术措施[4]
3.1定植
原则上朝向最好同树木原植地朝向一致时先在树穴底部垫入10~20cm厚腐熟的农家肥与土壤的混合肥(比例为1:1),土球上喷洒保水剂;方向确定后,向坑内回填少量土并塌实,保证树干与地面垂直稳定,用木棒或者铁丝支撑树体,然后剪开包装材料,将不宜腐烂的材料取出。树木栽植的深浅也有所不同,主根侧根发达,须根不多的树,土球2/3入地,1/3露在地面,然后培土成丘;主根不发达,侧根须根较多的树宜平地栽植,为防止浇水后土塌树斜,填土应分层塌实,每20~30cm塌实一次,并尽量采用原土种植。
3.2栽植坑
栽植坑大小视移栽大树的土球大小而定。一般胸径8-10cm的落叶乔木,挖直径100cm、深70cm的树坑,大树可再挖深些、宽些。每坑施腐熟有机肥20~25kg,填入30cm厚的客土后栽植。栽前先测定树坑的深浅宽窄。稍作修整后放入土球,要求土球高出地面5cm左右。一人扶正树干,另一人剪除土球上的包装物,先填表土、后填心土,边填土边踏实,做到“一埋二栽三提“然后浇透水,水渗后最后用土在树干基部培成馒头状,搭支架固定,防止树木摇晃。
三、园林绿化树木抚育管理[3]
常言说:“三分造七分管”。包括保湿、固定、施肥、遮阴、松土、除草、加土、扶正、修剪、留芽、病虫害防治等工作。4~6月份,气温逐渐升高树木生长旺盛,需要经常浇水。以浇透、土面潮湿而不积水为度。7~8月份雨季注意排水。施肥结合松土浇水进行。用充分腐熟的有机肥,如人畜粪尿等加水稀释后施用。施肥要求稍离根部,可以沿原栽植穴外围施肥,施肥后覆土保墒。经过多次浇水和下雨土壤板结,透气性差,要及时松土。一般每月松土、除草一次,松土深度为5~8cm,新栽植的大树,下雨后全面检查一次,树干动摇的加土踩实,根部下沉凹陷的覆土填平,歪斜的扶正加固。
1.固定
高大的乔木栽植后应随即以支柱支撑加固。一般立三根,以支点不低于树高2/5,支柱与地面夹角不大于600为佳。
2.保湿
晴天隔7~10天后浇第2次水,隔15~18天后浇第3次水,以后浇水间隔期可适当拉长,期间根部可以灌一至两次生根剂,常绿树可结合树冠喷水、喷雾加以保湿,以不淋湿表层土壤为度,如连日降雨不停,应地表遮雨,以防长时间积水浸泡,造成根系腐烂。浇水后出现土壤沉陷,致使树木倾斜时应扶正、培土,及时封好树穴。
3.遮阴
如是喜荫树种,栽植后若阳光过强,应搭架拉遮阳网,以防止日光灼伤和水分散失。
4.施肥
移栽的树木在第一年不需要施化肥,翌年的秋季进行秋季施肥,高大落叶乔木距树干地径30cm处环穴12cm深施500ɡ磷酸二氨,将其穴沟表土填平。
5.修剪
虽然在移栽前做过修在,栽植后仍需及时检查和修剪整理,在运输和栽植过程中折断和受伤的枝条应全部剪掉。在不影响树型美观和树冠基本完整的基础上,对枝叶进行适当的疏剪、短截、回缩。具体修剪量视树木再生能力而定,一般可达30~50%。
6.松土(培土)第一水浇过6天后,进行二次培土,各地的时间有差异,一般根据树坑浇水后土壤裂缝而定时间;浇二水后观察土壤泛白进行松土,松土深度5-8㎝。
7.除草
一般情况下新移栽的树木杂草甚微,翌年的秋季进行除草。
8.留芽
必须尽量提高芽位,在枝干较高部位留芽,芽位高则水势强,水分养分向高处运输,带动全株生长。
9.病虫害防治
新移栽树木的抗病能力差,所以应根据当地病虫害发生情况随时观察,适时采取预防措施。
10.越冬管理
保证足够的越冬水,到大雪节灌透第一水,过一月后进行灌第二水。
四、讨论
城市园林绿化树木的栽植养护因树种、环境、季节的实际情况不同而有所差异,需要在实践中加以分析掌握,因时因地因树灵活的加以应用才能收到预期的效果。树木成活与否不能从一个生长年得出结论,而需要2~3个生长年的逐步适应才能完全成活,才能安全度过危险期,因此必须加强维护,以防前功尽弃。值得注意的是,大树移栽虽然有利于改善城市的生态环境,但也要考虑其技术难度和经济投入,要因地制宜,不能盲目效仿,更不能随意破坏自然资源。
参考文献:
[1]蔡玉新、陈忠、万旭东、陈金萍,影响大树移植成活的原因及对策,贵州农业科学,2001,29(6).
[2]陈有民,园林树木学,北京:中国林业出版社,2001.
[3]胡万银,大树的移植技术及养护管理,山西林业科技,2002,3(1).
[4]蒋向中,大树移栽技术,教育与研究,1997,(1).
[5]萧鸣,美化家园,北京:中国环境科学出版社,1999.
[6]王晓华,浅谈大树移栽技术,内蒙古林业,2000、8.