三峡三期碾压混凝土围堰(简称RCC围堰)在三期上下游土石围堰保护下修建而成,与下游土石围堰联合保护右岸大坝,电站厂房及石岸非溢流坝段的施工,承担着挡水发电和通航的任务,其运行期为4年,即2003年至2007年。它是三峡工程二、三期施工衔接的关键性控制工程,也是三峡工程建设的技术难题之一,其成败直接影响三峡工程
The Three Gorges Project RCC cofferdam (RCC cofferdam) is constructed under the protection of the upper and lower reaches of the earth and rock cofferdam. The third-phase RCC cofferdam is jointly constructed with the downstream rock and soil cofferdam to protect the construction of the right bank dam, power station building and rockbank non- Bear the task of water and power generation and navigation, the operation period of 4 years, that is, from 2003 to 2007. It is the key control project of the construction of the second and third phases of the Three Gorges Project and also one of the technical problems in the construction of the Three Gorges Project. Its success or failure has a direct impact on the Three Gorges Project