1 前言黄河下游河道整治工程通常采用柳石楼厢进占、柳石枕护根、外抛散石护坡的结构型式。这类结构具有施工简单、技术易掌握、可就地取材等优点。但这类传统结构易出险情,需经过长时间的靠溜考验,通过不断出险、反复抢护直至根石到达最大冲刷坑底部时才会稳定下来,给每年的防汛工作带来很大被动。为改变这种被动抢险局面,近年来,邙金局试验了多种新结构坝型:铰链模袋坝、透水桩坝、挤压块沉排坝,1998年5月又在马渡下延94坝采
1 Introduction The lower reaches of the Yellow River river regulation projects are usually used Liu Shixian car into account, Liu Shi pillow nursing, throwing bulk stone slope structure. This kind of structure has the advantages of simple construction, easy to grasp of technology, easy to draw on the spot and so on. However, such traditional structures are prone to danger and require a long period of leaning tests. They will not be stabilized until they reach the bottom of the largest scouring pit by continuously running out of danger and causing great passiveness to the annual flood control work. In order to change this situation of passive rescue, in recent years, the Bureau has experimented with a number of new structural dam types, such as hinged bag-shaped dams, permeable pile dams and subsidence dikes. In May 1998, it was delayed 94 Dam mining