2003年柳钢的产品结构调整和工艺技术装备结构调整取得了实质性的进展,当年完成固定资产投资15.81亿元,相继完成并投产的技术改造项目主要有:1号高炉扩容改造、高速线材、6号750m3高炉、1号100吨转炉及7机7流方坯连铸机、70万吨焦/年一期工程、120万吨/年球团、110m2烧结机、3号250m3石灰窑、15000m3/h制氧机、220kV总降、6000kW发电、供料系统及原料场、总图运输等一批公辅项目。
In 2003, LiuGang made substantial progress in product mix readjustment and structural adjustment of its technology and equipment. In the same year, it completed a total investment of 1.581 billion yuan in fixed assets. The technological transformation projects that were completed and put into production in the first half of the year included: expansion and reconstruction of No. 1 blast furnace, 750m3 blast furnace on the 6th, 100t on the 1st and 7 on the 7th billet caster, 700,000 tons coke / year project, 1.2 million tons / year pellet, 110m2 sintering machine, 3 250m3 lime kiln, 15000m3 / h oxygen generator, 220kV total drop, 6000kW power generation, feed system and raw materials market, the total map transport and a number of public auxiliary projects.