论文部分内容阅读
一、概述 德国西门子公司为美国西部电业管理局(简称西局)提供的先进型串联补偿装置,于1992年投运。它安装在美国亚利桑那州的卡岩塔地区,该装置的投运为几个电力公司的电网提供了准确、连续的潮流控制,使得输电系统在更接近于输电线热容量的情况下可靠地运行,能更充分地利用现有输电线路,从而在一定程度上避免了为了增加输送功率而增设新的线路,这对保护环境非常重要。这项技术在挖掘利用输电线路的潜在能力方面所产生的经济效益是很明显的,可以在短时间内收回设备的投资。
First, an overview Germany’s Siemens company for the Western Electric Authority (referred to as Western Bureau) to provide advanced series compensation device, put into operation in 1992. Installed in the card rock tower area of Arizona, USA, the plant’s operation provides accurate and continuous power flow control for several power companies’ grids, enabling reliable operation of the transmission system closer to the heat capacity of the transmission line, Can make full use of the existing transmission lines, thereby avoiding to some extent, in order to increase the transmission power and adding new lines, which is very important for the protection of the environment. The economic benefits of this technology in tapping the potential capabilities of utilizing transmission lines are evident and investment in equipment can be recovered within a short period of time.