文章描述了高通量工程试验堆(简称HFETR)关键过程参数测量装置数字化设计、设备制造、出厂测试、出厂验收及设备现场安装方面的主要控制流程,分析了装置研制和设备现场实施中影响质量的主要因素,并针对两个主要阶段开展相应的质量控制措施。通过在整个项目实施过程中开展切实可行的质量控制措施,保证了项目在技术上满足设计要求,并成功实现了安全运行,为研究堆同类设备设计、集成及调试的质量控制提供了借鉴和参考。
The paper describes the main control flow of digitization design, equipment manufacture, factory test, factory acceptance and equipment installation on the key process parameter measurement devices of High Throughput Engineering Test Reactor (referred to as HFETR), and analyzes the main control flow in device development and on-site implementation of equipment, Of the main factors, and for the two main stages of the corresponding quality control measures. By practicing quality control measures throughout the project implementation process, it has ensured that the project technically meets the design requirements and has successfully achieved safe operation, thus providing reference and reference for the quality control of similar equipment in research reactor integration and commissioning .