论文部分内容阅读
(一) 设计文件中的指导性施工组织设计,已为施工的初步阶段提供了组织方案。但在施工过程中,某些具体情况可能有所变化,施工管理和技术方面也可能有新的改进,因此在施工前还应编制实施性施工组织设计。它的重要性就在于:根据设计文件和计划任务的要求,结合当时当地具体情况与技术组织措施的规定,进一步合理安排,使施工组织更为先进和切合实际,并将全部施工过程中的一切复杂工作有机地结合起来,使之互相配合、互相?接,帮助施工人员预见工作中的主要环节,正确地使用现有人力物力,据以作好施工准备工作。我们对工程财务计划中所要求的各项主要指标,已经明确了全年施工的奋斗目标。但是如何实现这些指
(1) The guiding design of the construction organization in the design documents has provided the organization plan for the initial stage of construction. However, some specific conditions may change during the construction process, and new improvements may also be made in construction management and technology. Therefore, before the construction, an implementing construction organization design should also be prepared. Its importance lies in: in accordance with the requirements of the design documents and the planned tasks, combined with the local specific circumstances and the provisions of the technical organization measures, further reasonable arrangements to make the construction organization more advanced and realistic, and all the construction process of all The complicated work is organically combined so that they cooperate with each other to help constructors foresee the main links in their work and properly use existing manpower and resources to prepare for construction. We have made clear the main objectives for the construction of the financial plan in the annual construction has been the goal. But how to achieve these means