我国大多数导流洞为城门洞形断面 ,若改建旋流洞需要改成圆形断面 ,致使二期工程量大幅度增加 ,不经济。结合公伯峡水电站导流洞改建旋流式泄洪洞试验研究 ,采用收缩墩形成水垫塘的技术 ,大大缩短旋流洞的长度 ,同时增加消能力度 ,使泄洪洞的消能率达到 85 %以上 ,流速降至 15m/s以下 ,可防止洞内空蚀和下游冲刷、雾化现象 ,为导流洞改建旋流式泄洪洞的推广应用开辟了新的途径
Most of China’s diversion ditches are gate-shaped cross-sections. If the rebuilt swirling vaults need to be changed into circular cross-sections, the volume of the second-phase projects will increase substantially and will be uneconomical. In combination with the experimental study on the reconstruction of the diversion tunnel of the Gongboxia Hydropower Station, the technique of shrink plunging to form a plunge pool greatly shortens the length of the cyclone tunnel and increases the energy dissipation rate so that the energy dissipation rate of the flood discharge tunnel reaches 85% , The flow rate is reduced below 15m / s to prevent cavity cavitation erosion and downstream erosion and atomization, which opens up a new way for the popularization and application of diversion tunnel reconstruction cyclone-type spillway tunnel