论文部分内容阅读
建立了模拟水电站水锤的一维LB模型.通过实例计算与特征线法进行了比较,结果表明LB方法效果很好,将之引入水电站流场模拟是可行的,值得进一步探讨.
A one-dimensional LB model for simulating water hammer in hydropower station was established. Comparing with the characteristic line method through example calculation, the results show that the LB method works well. It is feasible to introduce it into the flow field simulation of hydropower station, and it is worth further exploration.