珠海发电厂地处沿海 ,软基处理的面积大 ,软土层深厚。根据场地的不同地质条件 ,采用了真空联合堆载预压法、堆载预压法、排水固结及强夯法。该软基处理工程因地制宜、就地取材 ,合理安排了施工顺序 ,实施工程监理制 ,重视工程的监测检验工作 ,加上强有力的管理 ,因而工程质量达到全部优良。
Zhuhai Power Plant is located in the coastal areas, soft-based large area, deep soft soil. According to the different geological conditions of the site, a combination of vacuum preloading method, stacking preloading method, drainage consolidation and dynamic consolidation method are adopted. The soft foundation treatment project according to local conditions, local materials, a reasonable arrangement of the construction sequence, the implementation of project supervision system, emphasis on monitoring and inspection of the project, coupled with strong management, so the quality of the project to achieve all excellent.