论文部分内容阅读
详细介绍了 5 1 1矿床 1 6号线地段地浸采铀现场试验情况 ,讨论了试验结果 ,并对井场抽注状态、抽出井降水漏斗形状等问题进行分析 ,对下阶段工业性试验提出建议。
This paper introduces the field test of in-situ leaching of uranium in line 51 of the 5111 deposit, discusses the test results, analyzes the well pumping status and the shape of the funnel in the well, and puts forward the industrial test in the next stage Suggest.