论文部分内容阅读
索风营水电站是贵州首批8个“西电东送”项目中最后一个开工建设的水电站,是贵州乌江水电开发有限责任公司按照“流域梯级滚动开发”宗旨,继乌江渡、东风、洪家渡等水电站之后,在乌江干流上开发建设的又一个新的电源点工程。电站位于贵州省黔西县与修文县交界处的乌江干流上,设计装机容量60万kW,年发电量20.11亿kW·h,总投资31.25亿元。电站大坝为碾压混凝土重力坝,最大坝高122m,坝顶长167m。目前,广大建设者正加倍努力建设,力争2005年8月首
Suofengying Hydropower Station is the first batch of 8 hydropower stations under construction in Guizhou Province. It is the purpose of Guizhou Wujiang Hydropower Development Co., Ltd. in accordance with the purpose of “cascade rolling development of watershed” and following the Wujiang crossing, Dongfeng, Hongjiadu and other hydropower stations, the Wujiang River in the development and construction of a new power point project. The power station is located on the Wujiang River at the junction of Qianxi County and Xiuwen County in Guizhou Province. The designed capacity is 600,000 kW and the annual generating capacity is 2.011 billion kW · h, with a total investment of 3.13 billion yuan. Dam for the RCC gravity dam, the maximum dam height 122m, crest length 167m. At present, the majority of builders are redoubling their efforts to build and strive for the first in August 2005