雨期施工主要应做好防雨、防风、防雷、防电、防汛等工作。比如基础工应开设排水沟、基槽、坑沟等,雨后积水应设置防护栏或警告标志,超过1m的基槽、井坑应设支撑。一切机械设备应设置在地势较高、防潮避雨的地方,要搭设防雨棚。机械设备的电源线路要绝缘良好,要有完善的保护接零。等等。同时,做好雨后整改工作也很重要。对雨淋后的砖,如含水量较大的要晾干后再使用。对暴雨、大雨冲刷严重的砌体要拆除重砌。对遭雨冲刷的新浇筑的砼,应经有关部门鉴定或处理后才能继续施工。雨后对模板和支撑要进行认真检查,特别要注意支撑的底部是否有松动沉降现象,以便及时采取措施。
Rainy weather construction should do a good job of rain, wind, lightning, electricity, flood control and other work. For example, foundation workers should set up drainage ditches, foundation trenches, ditch ditches, etc. After the rain, water should be set up guardrails or warning signs, more than 1m base trough, pit should be set up to support. All machinery and equipment should be set in the higher ground, damp shelter, to set up a rain shelter. Mechanical equipment, power lines to be well insulated, have a perfect protection then zero. and many more. At the same time, it is also important to make rectification work after the rain. After the rain bricks, such as larger water content to be dried before use. Heavy rain, heavy rain washed masonry to remove heavy puzzle. Newly poured concrete that has been washed by the rain should be appraised or disposed of by relevant departments before construction can continue. After the rain on the template and support to be carefully checked, with particular attention to whether the bottom of the support settlement phenomenon, in order to take timely measures.