论文部分内容阅读
介绍了唐镇新市镇商办项目的关键技术难点分析,包括对于超限高层的判定及计算分析加强措施;由于场地条件特殊,对于既有结构的桩基基础在地铁保护区的计算复核;既有地下室加固的原因分析及设计方法。
This paper introduces the key technical difficulties analysis of Tangshan New Town commercial project, including the judgment of upper limit and the strengthening measures of calculation and analysis. Due to the special site conditions, the calculation and review of the existing structure of pile foundation in Metro Conservation Area Basement reinforcement reasons and design methods.