论文部分内容阅读
从施工角度描述了冻土区水力冲填的经验,分析了施工方法选择的主要方面(包括多年冻土施工方法-原理一和冻土活动的施工方法-原理二)。水力冲填厚度的变化对建成区冻土环境的影响已经呈现。基础工程的功能已被广泛认可。提出了全面的水文地质监测,以检测地基的土热和机械状态,对雅库茨克新发展区域的冻土产生了广泛而深远的影响。
Described from the construction point of view of hydraulic filling experience in permafrost region, analyzed the main aspects of the selection of construction methods (including permafrost construction methods - the first principle and permafrost construction methods - Principle II). The impact of the change of hydraulic filling thickness on the permafrost environment in the built-up area has been presented. The function of basic engineering has been widely recognized. A comprehensive hydrogeological monitoring was proposed to detect soil thermal and mechanical conditions of the ground and have a broad and far-reaching impact on the frozen earth in the newly developed Yakutsk region.