The elasto brittle plastic finite element analysis has been taken on the prediction for the deformation of the northwall of an open pit of Fushun, China. Numerical simulation has been made on the reinforcement measures of the slope structure. Using parameter identification techniques and connecting with elasto brittle plastic finite element program, the displacement back analysis has been made on the material parameters of the rockslope. The equivalent parameter values of the real slope structure have been obtained. The process of the rapid increment of the slope′s deformation caused by open mining during 1987~1990 has been reappeared through the numerical simulation.
The elasto brittle plastic finite element analysis has been taken on the prediction for the deformation of the northwall of an open pit of Fushun, China. Numerical simulation has been made on the reinforcement measures of the slope structure. Using parameter identification techniques and connecting with elasto brittle plastic finite element program, the displacement back analysis has been made on the material parameters of the rockslope. The equivalent parameter values of the real slope structure have been obtained. The process of the rapid increment of the slope’s deformation caused by open mining during 1987 ~ 1990 has been reappeared through the numerical simulation.