主要从炉内热负荷分布、割管检查、水动力分配情况以及变工况运行等方面分析了洛河电厂2号炉水冷壁频发性爆管的原因。介绍在燃烧调整相对合理的条件下,按照水动力工况与热负荷匹配的原则,对水冷壁水动力进行了调试,提出了防止水冷壁超温的措施。
Mainly from the furnace heat load distribution, cutting pipe inspection, hydrodynamic distribution and variable working conditions and other aspects of the Luohe Power Plant No. 2 boiler water wall burst tube causes. Introduction Under the condition of relatively reasonable combustion adjustment, according to the principle that the hydrodynamic conditions match the thermal loads, the hydrodynamic of the water wall is debugged, and measures to prevent over-temperature of the water wall are put forward.