摘要: 随着经济的发展迅速,我国建筑业也得到了飞速发展,深基坑工程支护作为建筑工程重要工作,保证建筑建筑工程的地下结构施工以及基坑周围周边环境的安全性问题,基坑侧壁以及周边环境大部分采用的是支档、加固与保护措施。本文就建筑工程施工中深基坑支护的施工技术管理进行了分析阐述。 中国论文网 h
关键词: 建筑工程、深基坑支护施工技术、
中图分类号: TU198 文献标识码: A
Abstract: along with the economic development is rapid, construction industry in our country also obtained the rapid development of deep foundation pit engineering support as an important work construction, guarantee the building construction of underground structure construction and the safety of the foundation pit surrounding environment problem, most of them adopt foundation pit side wall, and surrounding areas is a file, reinforcement and protection measures. In this paper, the construction of deep foundation pit support construction the construction technology of management are analyzed in this paper. Net of paper of China h
Keywords: building engineering, construction technology of the deep foundation pit supporting,
近幾年,由于我国加快了社会整体经济建设的步伐,从而促使我国城市现代化的迅猛发展,城市中各种建筑纷纷增多。在城市的深基坑设计中一定要注意保护周围的建筑物的安全性,确保周围建筑物的正常使用,深基坑技术主要应用于高层建筑的建造以及工业领域中,但是现代的深基坑的支护结构通常是临时性的结构,这就在很大程度上增加个企业部门的经济的投入,造成资源的浪费,同时,这种临时性的支护结构并不能确保工程的安全可靠性,一旦操作不当就会造成建筑工程事故的发生,通过对建筑施工中深基坑支护技术的特点、结构分类以及常见施工问题,从而强化深基坑施工支护技术在建筑工程中的应用,降低安全隐患的出现,保障工程建设施工可靠性和安全性,保障企业、社会、员工的生命、财产的安全,实现建筑企业可持续快速高效发展。
一、建筑工程领域的深基坑的支护技术类型
建筑领域的深基坑技术在很大程度上确保了建筑工程的顺利进行,常见的支护技术的类型主要有以下几种:
1、深基坑的钢板桩的支护结构。这种建筑施工技术是一种相对比较简单的支护的设计方法,而且投资比较低。这种设计方法通常用于软地层。
2、地下的连续墙的设计。这种墙体结构的设计能够有效的提高整个建筑的刚度,提高整个建筑的防渗性。这种设计结构通常情况下用于软粘土以及沙土等各种地质结构比较复杂的施工环境中。
3、柱列式的灌注桩的排桩支护的建筑设计。这种支护技术的设计方式主要分为疏排设计和密排设计两种形式。这种支护的设计在桩顶的设计过程中一定要注意浇注相对比较大的截面的钢筋,并且一定要确保混凝土梁帽连接的可靠性。为了防止地下水及其杂质在空隙内流入深基坑内,在建筑过程中应该使用高压注浆的操作方法。
二、建筑工程中基坑支护存在的问题
虽然深基坑支护施工技术存在着诸多优点,但是在实际工作中同样会由于环境、实际等方面的影响,产生一些工程问题。下面对深基坑支护施工技术常见的问题进行简要说明:
1、深基坑环境复杂性,在建筑工程施工过程中,由于建筑工程环境的多样性和复杂性,造成在深基坑防护施工设计中,实际工作中经常出现诸多问题,由于软土地层或是涌水地层没有被及时勘察出来,造成深基坑防护;工程会产生一些施工问题,严重影响整体施工质量和工程进度,因而应加强在环境方面的预防和控制,从而保障支护施工的顺利进展。
2、设计与施工不达标,目前我国建筑设计人员不乏存在着经验技术不强的问题,造成在设计初期设计人员对整体施工项目认识不足,常常会出现设计理论和施工工作脱节的问题。同时,施工人员没有按照正确工程设计方案进行规范性施工,在处理边坡面问题时不能给予合理的解决,部分施工单位为了缩短工程施工周期,部分深基坑防护协调工作没有做到位,自目地追赶工程进度,忽视了工程整体质量,从而降低了建筑工程整体结构稳定性,给深基坑支护工作带来诸多安全隐患。
3、基坑工程中地下水的影响,深基坑支护施工中地下水对于工程整体质量的影响同样不可忽视,在进行基坑工程的开挖和支护过程中,对于地下水不能进行合理的勘察,将会造成地下水灾患的出现,不仅延误工程进度,同样会带来一定的安全隐患,产生不必要的人员伤亡。因而应加强对地下水有效的监管工作,对建筑工程施工范围内的地下水进行全面的勘察,减少深基坑支护中涌水、渗水等问题的出现,整体提升建筑工程质量。
三、建筑工程施工中深基坑支护的施工技术
1、施工准备环节
高层建筑深基坑支护施工准备环节的内容主要包括核对基坑开挖的深度、复核施工场地各部分的标高,以及检查建筑物周边建筑及地下管线的实际分布情况是否与前期搜集的资料相符等。高层建筑深基坑支护施工的准备环节是保证整个施工过程顺利进行的基础。因而,一旦发现问题,必须要立即加以处理,从而将施工安全事故发生的可能性控制的范围之内。
2、支护桩施工环节
支护桩的施工是深基坑支护工程的基础,通常情况下,采用人工挖孔桩与钢筋混凝土护壁搭配的方式即可满足工程建设的需要,其间需要密切注意施工现场的环境变化。当工程所在地的地质条件较为复杂时,需要根据土壤的变化情况,适当调整泥浆的成分,做好钢筋笼吊装与沉放工作,科学的安排各项施工工序。当成孔过程需要进行中断时,要严格的控制中断的时间,避免因为作业暂停而影响到装机的质量。
3、锚杆施工环节
锚杆的施工是高层建筑深基坑支护施工承上启下的关键环节,锚杆的安装工作,对保证高层建筑深基坑支护工程的施工质量有着至关重要的作用。作为深基坑支护工程中的承拉构件,其一端锚固于地基结构当中,另一端则与结构物相连接,起到了增强构筑物整体强度和承压能力的作用。当基坑开挖的深度达到锚杆施工的要求后,便可以进行作业。当注浆达到要求的强度后,则应安装钢梁等设施,为下一步的锚固打好基础。锚固完毕后,进行质量检测,待确定锚杆施工的质量满足工程建设的要求时,方可进行下一步的施工。
4、土方开挖环节
作为高层建筑深基坑支护施工过程中工程量最大的环节,土方开挖的过程对周围环境造成的干扰也是最为严重的。因此,在进行高层建筑基坑土方开挖的过程中,往往需要采取分层开挖的方式,减小工程对外界的影响,并随时注意周围环境的变化,及时根据施工现场及周围的具体状况调整施工的方案和施工的策略,一旦发生问题,需要在第一时间查明原因并采取相应的解决方法,以确保工程的施工质量和施工安全。
四、深基坑支护施工方案技术要求
建筑工程的深基坑支护工程施工能否成功,前期的施工方案设计十分关键,这对于方案的设计还一定要运用最新的技术,以及施工理念来进行,若是具有针对性的具体问题分析,还应该根据施工现场的施工情况,结合具体的地质结构来制定一套科学、严谨施工方案,这样既要有严谨的施工方案还要安全的进行。运用最新的施工技术以及施工理念,对出现的不同情况进行具体的分析,并依据现场反馈情况进行具体的设计。要总领全局,探求最切实际的设计方案。
具体做法是主持设计的人员必须具备较高的专业知识,还要有丰富的支护设计实际经验,对所要施工地点的水文地质特点要把握准确,对周边环境要熟悉。综合以上情况设计出科学合理的支护施工方案。
设计方案必须满足两方面技术要求;首先,确保边坡的稳定,满足变形控制要求,以确保基坑周围的建筑物、地下管线设施、道路等的安全,不得引起拟建筑物四周城市主干道开裂,影响市区交通;其次,确保基坑开挖顺利进行,并提供足够的地下室施工作业空间。
五、建筑工程基坑支护结构的选择
在建筑工程中深基坑支护技术不同于其他类工程技术,在一定程度上具有明显的优越性,适用范围广、风险性低等,目前被广泛应用在建筑工程建设中。以往的工程施工挖掘过程,都是采用直接放坡挖掘,对于城市工程施工这些方法都会无形中增加施工难度,造成深基坑技术的难实施。因而在对不同工程结构他特点采取不同施工技术,能够全面提升工程整体结构的安全性。如下对建筑工程基坑支护结构的选择进行详細介绍:
1、悬臂式支护结构。悬臂式支护结构指的是设置支撑和锚杆的支护体系,其需要有足够的入土深度作为基础,同时需要利用锚杆的抗弯强度来做支撑,以此来保证支护结构的安全性和稳定性,因此,悬臂式支护结构一般运用于土质较好,但是开挖深度不深的基坑。
2、拉锚式支护结构。拉锚式支护结构主要是由支护桩组成的支护体系,通常锚杆分为地面锚杆和土层锚杆,地面锚杆需要利用足够大的土地面积为锚桩的设置提供基础,而土层锚杆则需要具有较大的土层来提供较大的锚固力。
3、内支撑支护结构。内支撑支护结构主要是由支护桩或者是墙与内支撑组成,这种支撑结构对于土层的要求不高。
4、重力式挡土支护结构。其主要是利用挡土墙自身的重量来对土体所产生的压力进行抵抗,以此来达到支护的效果。
5、土钉墙支护结构。土钉墙支护结构由于自身的特点,一般由加固的土体、密置的土钉和喷射于坡面的混凝土面板组成。这种支护结构一定程度上能够增加建筑整体结构牢固性,特别使用在地下水以上的砂土和粘性土,具有一定的广泛性。但是在淤泥中这种支护方法就会略显不足。
6、水泥土桩墙支护结构。水泥土桩墙支护结构通过利用水泥作固化剂,进行水泥和软土的搅拌,从而让其发生一定的物理反应,产生具有更强承受力的水泥土桩体,实现对建筑结构整体牢固性的强化。
六、以深基坑支护施工结构选择详细阐述
基坑支护结构常见的形式有排桩支护、桩撑、桩锚、排桩悬臂;地下连续墙支护、地连墙支撑、水泥土挡墙、钢板桩支护、土钉墙、逆作拱墙、放坡、基坑内支撑等。支护结构的选择应先考虑本单位现有施工机构,优先考虑本工程基础桩相同类型桩作为基坑支护结构,如工程桩采用钢筋混凝土灌注桩,则基坑支护结构应尽量选用这种桩型,其直径可相应选用较小直径,这样可减少进退场费用。
当基坑较深围护桩布置允许时,应尽量选用两排支护桩,因为此种布置方式力学性能较好,前后排桩与桩顶圈梁形成刚架结构,有效改善围护桩的受力状况,达到减少桩的配筋量。在施工过程中,当围护桩的要求达到防渗的要求的时候,基坑深度小于7m,地表杂填土中砖瓦碎片含量较多时,不宜单独选用水泥搅拌桩,搅拌桩要改为水泥注浆。就拿北方来讲,地区性的粘土较多,一般基坑都较深,因此,可选用钢筋混凝土桩加锚杆支护的形式进行施工,若是在南方就不适用,因此,主要可选用大直径钢筋混凝土灌注桩的施工方法进行施工,桩顶加钢筋混凝土粱,转角处加斜支撑。凡是地基土为淤泥,且基坑又较深时,不宜选用钢板桩,选用钢筋混凝土地下连续墙。总之,深基坑支护形式的采用以及实施还应具体问题具体分析,根据实际的情况,考虑周边的环境以及地质条件等,经过多方案进行比较来选择经济效益最佳的支护结构。
结束语 深基坑工程的施工是一个循序渐进的过程,施工单位应按先设计、后施工的程序施工,并尽量做到边施工、边监测,还要遵循“分层开挖,先撑后挖,随挖随撑,对称均衡,限时限量”的原则,杜绝盲目施工和野蛮施工的现象,加强对整个深基坑施工过程的控制,保证工程顺利、安全地完成。
参考文献:
[1].兰焕明.浅析建筑工程基坑支护施工技术要点.[J].科技创新.2013.
[2].邱杨.浅谈建筑工程基坑支护施工技术.[J].科技创新与应用.2013.
关键词: 建筑工程、深基坑支护施工技术、
中图分类号: TU198 文献标识码: A
Abstract: along with the economic development is rapid, construction industry in our country also obtained the rapid development of deep foundation pit engineering support as an important work construction, guarantee the building construction of underground structure construction and the safety of the foundation pit surrounding environment problem, most of them adopt foundation pit side wall, and surrounding areas is a file, reinforcement and protection measures. In this paper, the construction of deep foundation pit support construction the construction technology of management are analyzed in this paper. Net of paper of China h
Keywords: building engineering, construction technology of the deep foundation pit supporting,
近幾年,由于我国加快了社会整体经济建设的步伐,从而促使我国城市现代化的迅猛发展,城市中各种建筑纷纷增多。在城市的深基坑设计中一定要注意保护周围的建筑物的安全性,确保周围建筑物的正常使用,深基坑技术主要应用于高层建筑的建造以及工业领域中,但是现代的深基坑的支护结构通常是临时性的结构,这就在很大程度上增加个企业部门的经济的投入,造成资源的浪费,同时,这种临时性的支护结构并不能确保工程的安全可靠性,一旦操作不当就会造成建筑工程事故的发生,通过对建筑施工中深基坑支护技术的特点、结构分类以及常见施工问题,从而强化深基坑施工支护技术在建筑工程中的应用,降低安全隐患的出现,保障工程建设施工可靠性和安全性,保障企业、社会、员工的生命、财产的安全,实现建筑企业可持续快速高效发展。
一、建筑工程领域的深基坑的支护技术类型
建筑领域的深基坑技术在很大程度上确保了建筑工程的顺利进行,常见的支护技术的类型主要有以下几种:
1、深基坑的钢板桩的支护结构。这种建筑施工技术是一种相对比较简单的支护的设计方法,而且投资比较低。这种设计方法通常用于软地层。
2、地下的连续墙的设计。这种墙体结构的设计能够有效的提高整个建筑的刚度,提高整个建筑的防渗性。这种设计结构通常情况下用于软粘土以及沙土等各种地质结构比较复杂的施工环境中。
3、柱列式的灌注桩的排桩支护的建筑设计。这种支护技术的设计方式主要分为疏排设计和密排设计两种形式。这种支护的设计在桩顶的设计过程中一定要注意浇注相对比较大的截面的钢筋,并且一定要确保混凝土梁帽连接的可靠性。为了防止地下水及其杂质在空隙内流入深基坑内,在建筑过程中应该使用高压注浆的操作方法。
二、建筑工程中基坑支护存在的问题
虽然深基坑支护施工技术存在着诸多优点,但是在实际工作中同样会由于环境、实际等方面的影响,产生一些工程问题。下面对深基坑支护施工技术常见的问题进行简要说明:
1、深基坑环境复杂性,在建筑工程施工过程中,由于建筑工程环境的多样性和复杂性,造成在深基坑防护施工设计中,实际工作中经常出现诸多问题,由于软土地层或是涌水地层没有被及时勘察出来,造成深基坑防护;工程会产生一些施工问题,严重影响整体施工质量和工程进度,因而应加强在环境方面的预防和控制,从而保障支护施工的顺利进展。
2、设计与施工不达标,目前我国建筑设计人员不乏存在着经验技术不强的问题,造成在设计初期设计人员对整体施工项目认识不足,常常会出现设计理论和施工工作脱节的问题。同时,施工人员没有按照正确工程设计方案进行规范性施工,在处理边坡面问题时不能给予合理的解决,部分施工单位为了缩短工程施工周期,部分深基坑防护协调工作没有做到位,自目地追赶工程进度,忽视了工程整体质量,从而降低了建筑工程整体结构稳定性,给深基坑支护工作带来诸多安全隐患。
3、基坑工程中地下水的影响,深基坑支护施工中地下水对于工程整体质量的影响同样不可忽视,在进行基坑工程的开挖和支护过程中,对于地下水不能进行合理的勘察,将会造成地下水灾患的出现,不仅延误工程进度,同样会带来一定的安全隐患,产生不必要的人员伤亡。因而应加强对地下水有效的监管工作,对建筑工程施工范围内的地下水进行全面的勘察,减少深基坑支护中涌水、渗水等问题的出现,整体提升建筑工程质量。
三、建筑工程施工中深基坑支护的施工技术
1、施工准备环节
高层建筑深基坑支护施工准备环节的内容主要包括核对基坑开挖的深度、复核施工场地各部分的标高,以及检查建筑物周边建筑及地下管线的实际分布情况是否与前期搜集的资料相符等。高层建筑深基坑支护施工的准备环节是保证整个施工过程顺利进行的基础。因而,一旦发现问题,必须要立即加以处理,从而将施工安全事故发生的可能性控制的范围之内。
2、支护桩施工环节
支护桩的施工是深基坑支护工程的基础,通常情况下,采用人工挖孔桩与钢筋混凝土护壁搭配的方式即可满足工程建设的需要,其间需要密切注意施工现场的环境变化。当工程所在地的地质条件较为复杂时,需要根据土壤的变化情况,适当调整泥浆的成分,做好钢筋笼吊装与沉放工作,科学的安排各项施工工序。当成孔过程需要进行中断时,要严格的控制中断的时间,避免因为作业暂停而影响到装机的质量。
3、锚杆施工环节
锚杆的施工是高层建筑深基坑支护施工承上启下的关键环节,锚杆的安装工作,对保证高层建筑深基坑支护工程的施工质量有着至关重要的作用。作为深基坑支护工程中的承拉构件,其一端锚固于地基结构当中,另一端则与结构物相连接,起到了增强构筑物整体强度和承压能力的作用。当基坑开挖的深度达到锚杆施工的要求后,便可以进行作业。当注浆达到要求的强度后,则应安装钢梁等设施,为下一步的锚固打好基础。锚固完毕后,进行质量检测,待确定锚杆施工的质量满足工程建设的要求时,方可进行下一步的施工。
4、土方开挖环节
作为高层建筑深基坑支护施工过程中工程量最大的环节,土方开挖的过程对周围环境造成的干扰也是最为严重的。因此,在进行高层建筑基坑土方开挖的过程中,往往需要采取分层开挖的方式,减小工程对外界的影响,并随时注意周围环境的变化,及时根据施工现场及周围的具体状况调整施工的方案和施工的策略,一旦发生问题,需要在第一时间查明原因并采取相应的解决方法,以确保工程的施工质量和施工安全。
四、深基坑支护施工方案技术要求
建筑工程的深基坑支护工程施工能否成功,前期的施工方案设计十分关键,这对于方案的设计还一定要运用最新的技术,以及施工理念来进行,若是具有针对性的具体问题分析,还应该根据施工现场的施工情况,结合具体的地质结构来制定一套科学、严谨施工方案,这样既要有严谨的施工方案还要安全的进行。运用最新的施工技术以及施工理念,对出现的不同情况进行具体的分析,并依据现场反馈情况进行具体的设计。要总领全局,探求最切实际的设计方案。
具体做法是主持设计的人员必须具备较高的专业知识,还要有丰富的支护设计实际经验,对所要施工地点的水文地质特点要把握准确,对周边环境要熟悉。综合以上情况设计出科学合理的支护施工方案。
设计方案必须满足两方面技术要求;首先,确保边坡的稳定,满足变形控制要求,以确保基坑周围的建筑物、地下管线设施、道路等的安全,不得引起拟建筑物四周城市主干道开裂,影响市区交通;其次,确保基坑开挖顺利进行,并提供足够的地下室施工作业空间。
五、建筑工程基坑支护结构的选择
在建筑工程中深基坑支护技术不同于其他类工程技术,在一定程度上具有明显的优越性,适用范围广、风险性低等,目前被广泛应用在建筑工程建设中。以往的工程施工挖掘过程,都是采用直接放坡挖掘,对于城市工程施工这些方法都会无形中增加施工难度,造成深基坑技术的难实施。因而在对不同工程结构他特点采取不同施工技术,能够全面提升工程整体结构的安全性。如下对建筑工程基坑支护结构的选择进行详細介绍:
1、悬臂式支护结构。悬臂式支护结构指的是设置支撑和锚杆的支护体系,其需要有足够的入土深度作为基础,同时需要利用锚杆的抗弯强度来做支撑,以此来保证支护结构的安全性和稳定性,因此,悬臂式支护结构一般运用于土质较好,但是开挖深度不深的基坑。
2、拉锚式支护结构。拉锚式支护结构主要是由支护桩组成的支护体系,通常锚杆分为地面锚杆和土层锚杆,地面锚杆需要利用足够大的土地面积为锚桩的设置提供基础,而土层锚杆则需要具有较大的土层来提供较大的锚固力。
3、内支撑支护结构。内支撑支护结构主要是由支护桩或者是墙与内支撑组成,这种支撑结构对于土层的要求不高。
4、重力式挡土支护结构。其主要是利用挡土墙自身的重量来对土体所产生的压力进行抵抗,以此来达到支护的效果。
5、土钉墙支护结构。土钉墙支护结构由于自身的特点,一般由加固的土体、密置的土钉和喷射于坡面的混凝土面板组成。这种支护结构一定程度上能够增加建筑整体结构牢固性,特别使用在地下水以上的砂土和粘性土,具有一定的广泛性。但是在淤泥中这种支护方法就会略显不足。
6、水泥土桩墙支护结构。水泥土桩墙支护结构通过利用水泥作固化剂,进行水泥和软土的搅拌,从而让其发生一定的物理反应,产生具有更强承受力的水泥土桩体,实现对建筑结构整体牢固性的强化。
六、以深基坑支护施工结构选择详细阐述
基坑支护结构常见的形式有排桩支护、桩撑、桩锚、排桩悬臂;地下连续墙支护、地连墙支撑、水泥土挡墙、钢板桩支护、土钉墙、逆作拱墙、放坡、基坑内支撑等。支护结构的选择应先考虑本单位现有施工机构,优先考虑本工程基础桩相同类型桩作为基坑支护结构,如工程桩采用钢筋混凝土灌注桩,则基坑支护结构应尽量选用这种桩型,其直径可相应选用较小直径,这样可减少进退场费用。
当基坑较深围护桩布置允许时,应尽量选用两排支护桩,因为此种布置方式力学性能较好,前后排桩与桩顶圈梁形成刚架结构,有效改善围护桩的受力状况,达到减少桩的配筋量。在施工过程中,当围护桩的要求达到防渗的要求的时候,基坑深度小于7m,地表杂填土中砖瓦碎片含量较多时,不宜单独选用水泥搅拌桩,搅拌桩要改为水泥注浆。就拿北方来讲,地区性的粘土较多,一般基坑都较深,因此,可选用钢筋混凝土桩加锚杆支护的形式进行施工,若是在南方就不适用,因此,主要可选用大直径钢筋混凝土灌注桩的施工方法进行施工,桩顶加钢筋混凝土粱,转角处加斜支撑。凡是地基土为淤泥,且基坑又较深时,不宜选用钢板桩,选用钢筋混凝土地下连续墙。总之,深基坑支护形式的采用以及实施还应具体问题具体分析,根据实际的情况,考虑周边的环境以及地质条件等,经过多方案进行比较来选择经济效益最佳的支护结构。
结束语 深基坑工程的施工是一个循序渐进的过程,施工单位应按先设计、后施工的程序施工,并尽量做到边施工、边监测,还要遵循“分层开挖,先撑后挖,随挖随撑,对称均衡,限时限量”的原则,杜绝盲目施工和野蛮施工的现象,加强对整个深基坑施工过程的控制,保证工程顺利、安全地完成。